user login

steel frame warehouse construction and steel structure warehouse wide-span

1000.0 USD
Min. Order: 120 Metric Ton
Trade Term: FOB
Payment Terms: T/T
Supply Ability: 3000 Ton/per Week
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-768
Means of Transport: Ocean
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Shipment by: Shipment: 20'GP, 40'GP, 40'HQ, or in bulk
Service Offered: Design, fabrication, packing, transport, erection
Drawing Design: by client or by us by client
Product Characteristics: 4)Fire- resistant, clean and health 5)50-year-long life expectancy
Production Capacity: 3000 Ton/per Week
Packing: Sandwich panels covered with plastic film
Delivery Date: 15 to 40 days
Show

Product Description

1. Product Details for steel frame warehouse construction ( made of steel frame ) :

Main frame

1

Main steel structure

 

( columns and beams )

1 . Steel Q345 ( S355JR ) or Q235 ( S235JR ) H shape

2 . Straight cross-section or Variable cross - section

2

Sub steel structure

1 . Material Q235 ( S235JR ) steel

2 . Bolt connections . Anti-rust painted or galvanized .

3 . Bracing :X - type or V - type or other type bracing made from angle , round pipe , etc

4 . Purlins : C or Z type : Size from C120 ~ C320 , Z100 ~ Z200

Maintenance system

3

Roof

Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile

4

Wall

Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile


Doors

Steel rolling shutter or others


Windows

Alu. Alloy window , or others

Fitting

7

Edge Cover

Steel sheet 0.5mm thickness

8

Bolts

M24 , M22 , M16 embedded bolts , intensive bolts , galvanized ordinary bolts , high-strength bolts , etc

9

Others options

Day - lighting panel , Roof ventilator , Down pipe , Galvanized , Crane , sanitary Products , etc

10

Foundation

Cement and steel foundation bolts

 

 

2. Our products:

Steel structural warehouse building, workshop building, agricultural building( Horse / cattle barn, poultry house) , high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, prefab buildings, school, office building, truss roof warehouses, sandwich panel, corrugated steel sheet, C& Z section steel purlin, steel frame warehouse construction ( made of steel frame ) ) .

We can also supply different kind of doors and windows, cranes which is related to project.

 

3. Some of OUR WORKSHOP/ WAREHOUSE PROJECTS:

 

1) AREVA Transformer Factory Project:

Covering an area totaled 33, 842 sq.m, the program consumed steel in 4299 tons, the column height is 31-33 m, and the inside is installed with the bunk bed traveling crane with the maximum hoisting capacity in 400 tons.

2) NEW ZEALAND Barns / Grain Warehouses:

light gauge steel structure with cold bended profiles.

3) BOLIVIA Cement Plant:

Steel consumption: 3, 655 tons in the first phase, 7200 tons in the second phase.

4) LDK Polysilicon Public Project:

Was generally contracted by FLR CO., LTD, the total steel consumption volume for Phase I project reached over 3000 tons and this program was in a high-rise steel structure of 4-7 floors.

 

4. Certification for steel frame warehouse construction ( made of steel frame ) :

We are always committed to the development of steel structure. By far we have achieved the following certificates:

CE EN1090 certification

Quality Management System Certification ISO9001: 2008, by BV France

Environment Management System Certification ISO14001: 2004, by BV France

Occupational Health and Safety Management System Certification, by BV France

CWI certificate

TWI certificate

ASME certificate

AWS welder certificate etc.

 

5. Our seaworthy packing system for steel frame warehouse construction ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: How long is your delivery time for steel frame warehouse construction ( made of steel frame ) ?

A: Generally it is within 15-30 days after get the deposit and final drawing, definitely according to quantity and your requirements of steel frame warehouse construction ( made of steel frame ).

 

2) Q: What is the colors of your sandwich panels usually used ?

A: Off-white, ivory white, blue, green and red color.

 

3) Q: How can I get the quotation of the project ?

A: If you have drawing, we can offer you the quotation as per your dwgs. If you have no design, Our engineer make your idea to real warehouse and will design some drawings for you to confirm. And then offer you a quotation under your material demand and drawing.

 

 


Post Buying Request