user login

Prefabricated Steel Warehouse by heavy steel framming of two story

1000.0 USD
Min. Order: 100 Metric Ton
Payment Terms: T/T
Supply Ability: 3000 Ton/per Week
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-754
Means of Transport: Ocean
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Service Offered: Design, fabrication, packing, transport, erection
Specifications:: Column&Beam: Welded or Hot rolled H-section
Surface Treatment: painted with Hempel painted with JOTUN
Material Grade: Grade Q235, equivalent to ASTM A36 Grade Q345, equivalent to ASTM A572
Production Capacity: 3000 Ton/per Week
Packing: Panel accessories will be packaged in wooden box;
Delivery Date: 15 to 40 days
Show

Product Description

1. Prefabricated Steel Warehouse ( made of steel frame ) main components :

SIZE(m)

LENGTH * WIDTH * EAVE HEIGHT

 

TYPE

SINGLE SPAN , DOUBLE SPAN , MULTI - SPAN

ONE FLOOR , TWO FLOORS , THREE FLOORS

BUILDING FOUNDATION

STEEL FOUNDATION WITH ANCHOR BOLTS

COLUMN & BEAM

MATERIA L :Q235B & Q345B

BRACING

X or V TYPE BRACING MADE BY ANGEL STEEL , ROUND Bar etc 

Wall & Roof C or Z PURLINE

SIZE :C120 ~ C320mm ; Z100 ~ Z300mm

 

WALL & ROOF PANEL

SINGLE CORRUGATED STEEL SHEET

SANDWICH PANEL INSULATION WITH EPS , PU , ROCK WOOL etc

WINDOW & DOOR

PVC or ALUMINIUM ALLOY WINDOW

ELECTRIC ROOL - UP DOOR

SLIDING DOOR BY SANDWICH PANEL OR SINGLE CORRUGATED STEEL SHEET

SURFACE TREATMENT

HOT GALVANIZED COATING COLD GALVANIZING

Spray - Painting , Any color , or according to your request

 

 

ACCESSIORES

SEMI - TRANSPARENT SKYLIGHT BELTS

VENTILATORS ; DOWN PIPE ; GUTTER

STANDARD BOLTS

 

 

2. Who we are:

We are mainly specially steel structure construction company undertaking the design, fabrication, assembly, and after-sales service of various types of Prefabricated Steel Warehouse ( made of steel frame ), civil construction, heavy steel structures, stadiums, industrial workshops and warehouse building, steel structures high-rise building.

 

Now we have 3 heavy steel production line, six light steel production lines, 3 H-beam secondary processing lines, and advanced digital-controlled multi-head cutting machine,automatic submerged arc welding machine, assembly machine, calibrating machines, full-automatic shot blasting machines, totaling 200 equipment or more.

 

3. Project case- Congo Hebe Fabrication Petro-chemical Plant Module:

Product Description

Type 1 steel warehouse( 2500 m2) details:

A. Length: 130m

B. 10 meters between the 7 main frames

C. Height: 10 meters inside

D. Slope for roof: 23%

E. Aluminium panels for Roof with 35um coating thickness

F. 10T Overhead bridge Crane( also known as dual-beam bridge / gantry crane bridge

G. The Congo client need the side walls( only 3 sides) , for the 4th side, quoting a self collapsing gate

 

4. Certification for Prefabricated Steel Warehouse ( made of steel frame ) :

We are always committed to the development of steel structure. By far we have achieved the following certificates:

CE EN1090 certification

Quality Management System Certification ISO9001: 2008, by BV France

Environment Management System Certification ISO14001: 2004, by BV France

Occupational Health and Safety Management System Certification, by BV France

CWI certificate

TWI certificate

ASME certificate

AWS welder certificate etc.

 

5. Our seaworthy packing system for Prefabricated Steel Warehouse ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How about the delivery time of the Prefabricated Steel Warehouse ( made of steel frame ) ?

Reply: Usually, 5000SQM or 800tons steel building within 45-60 days after the order confirmed, also depends on the fabrication quantity.

 

2) What makes you different from other manufacturers ?

We believe our service department has the experience and knowledge to safely service your need for structural steel construction, such as industrial workshop, light steel warehouse, container house, Prefabricated Steel Warehouse ( made of steel frame ). We have trained service technicians who will be able to help your erection, and have been providing our customer's an effective service solution.

 

3) Can I customize my Prefabricated Steel Warehouse ( made of steel frame ) ?

Answer: We have as a wide variety of finishes and features that will satisfy your personal taste and needs. Please contact our sales to explain some detail you want to customize the warehouse.

 

 


Post Buying Request