user login

Pre-engineered Steel Structure Warehouse and heavy steel workshop trustworthy

1000.0 USD
Min. Order: 100 Metric Ton
Trade Term: FOB
Payment Terms: T/T
Supply Ability: 8000 Ton/per Month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-737
Means of Transport: Land
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Welding standard: AWS D1.1
Material Grade: Grade Q235, equivalent to ASTM A36 Grade Q345, equivalent to ASTM A572
Shipment by: bulk ship Shipment: 20'GP, 40'GP, 40'HQ, or in bulk
Service Offered: Design, fabrication, packing, transport, erection
Production Capacity: 8000 Ton/per Month
Packing: Panel accessories will be packaged in wooden box;
Delivery Date: 20 days
Show

Product Description

1. Characteristics for the Pre-engineered Steel Structure Warehouse ( made of steel frame ) :

1 ) Wide span : single span or multiple spans , the max span is 36m without middle column .

2 ) Low cost : Unit price range from USD35 / m2 to USD70 / m2 according to customers' request .

3 ) Fast construction and easy installation .

4 ) Long using life : up to 50 years .

5 ) Easy construction , time-saving , and labor saving 
6 ) Flexible layout , beautiful appearances , and higher space efficiency 
7 ) Be used as warehouses , workshops , shopping mall , dinning hall , stadium , etc .

8 ) Others : environmental protection , stable structure , earthquake proofing , water proofing , and energy conserving .

 

2. Company Data:

We have been focused on providing integrated steel structure and steel building solutions for the construction builders, design institutes, developers and construction material traders. Established in Shandong, our professional products and services have reached more than 100 countries and regions around the world. We mainly provides major steel structure and steel building solutions including Steel Structure Building,steel workshop& warehouse, Multi-story Building. Currently we have founded branch office and factory in many areas, with over 960 employees worldwide. And the production base is located at Shandong, China. We applies industry-leading environmentally friendly green materials, the world' s leading structural design. Our R&D center was established in Beijing and has applied more than 50 patents including 2 innovation patents up to now. Backed up with over 80 talented engineers in steel structural and architectural design.

 

3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:

Main steel frame:

Steel beam & column: Q345, Welded H beam

Wind-resistant column: Q345, Welded H beam

Secondary frame:

Roof purlin: Z250*75*20*2.2

Ceiling purlin: C120*50*20*2.2

Wall purlin: C180*70*20*2

Tie bar: 102*2

Vertical & horizontal bracing: 20

Kneel-bracing: L504

Purlin bracing: Q235, 12

Sleeves tube: Q235, 32*2.5

Roof system:

Type V930 pu panel 0.5/100/0.6mm Pu panel

Wall system:

Type v930 panel 0.5/100/0.6mm Pu panel

 

This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.

 

 

4. Drawings & Quotation for the Pre-engineered Steel Structure Warehouse ( made of steel frame ) :

1) Customized design to welcome.

2) As long as you like, we can design and provide drawings for you. Just give the technical data and your demand, we will give you the best offer.

3) In order to give you an exactly quotation and drawings, please tell us the Length, width, eave height and local weather.  We'll quote for you prompt.

 

5. Our seaworthy packing system for Pre-engineered Steel Structure Warehouse ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Do you provide on-site installation service for Pre-engineered Steel Structure Warehouse ( made of steel frame ) ?

We provides customers with one-stop integrated steel building solution including installation and operation. We have 3 options for on-site installation according to the customer' s specific situation. Firstly, we offer installation instructions and installation video. Secondly, we assign the installation team for the project. Finally, we send professional engineer to guide the local installation team.

 

2) What' s your delivery time of your Pre-engineered Steel Structure Warehouse ( made of steel frame ) ?

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.

 

 


Post Buying Request