user login

steel frame buildings and steel building construction low-cost sale to Dubai

1000.0 USD
Min. Order: 120 Metric Ton
Trade Term: CFR
Payment Terms: T/T
Supply Ability: 3000 Ton/per Week
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-406
Means of Transport: Ocean
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Surface Treatment: painted with Hempel
Drawing Design: dwgs Detailing by us
Software used: American STAAD-Pro Finland Xsteel
Service Offered: Design, fabrication, packing, transport, erection
Production Capacity: 3000 Ton/per Week
Packing: sea worthy packing
Delivery Date: 20 days
Show

Product Description

1. Information for steel frame buildings  ( made of steel frame ) :

Standard

ASTM , BS , DIN , GB , JIS

Material Grade

Q235 & Q345 ( S235JR & S355JR )

Dimensions

Yours requirements

Place Of Origin

Shandong China ( Mainland )

FOB Price

US $ 20 - 150 / Square Meter

Port

Qingdao

Minimum Order Quantity

100SQM

Supply Ability

1000 Ton / Tons per Month

Payment Terms

L/C ,T/T

Quality Control

The third party , SG S , ASIA INSPECTION all accept

Delivery Term

Within 20 days after signing contract

Packaging 

According yours requirement , usually bundle with steel strip

Delivery Container

20'GP , 40'GP , 40'HQ , 40'OT

Our Experience

Have exported for 13 years , clients from all over the world

 

 

2. We can supply the service for the follow products:

Steel Structure for industrial field, steel structure for civil fields, steel frame buildings  ( made of steel frame ) , steel buildings, steel workshop, high rise building steel warehouse, steel frame, steel portal frame, etc.

Our best service:

1) You are very welcome to visit our factory before the order, or during the production or after the production before loading.

2) We are very professional in all the kinds of different payment term, FOB, CIF, CFR by sea container or by train.

3) For the steel frame you require, you are very welcome to offer your own design, or you give us your idea, we provide our design, the production, the loading all for you.

 

3. Project case- 10000 tons heavy steel structure for Indian cement plant Project:

Description:

The whole steel consumption of this is more than 10000 tons, Among which, the steel consumption of steel roofing truss for steel structure homogenization silo and structural steel bunker is about 7000 tons.

Raw materials silo, clinker materials silo, electricity dust removal, pre-heater and other structures, together with steel structure buildings for subsidiary equipment, total steel structure components reach approximately 3, 000 tons.

 

4. DESIGN STANDARD& SOFTWARE for steel frame buildings  ( made of steel frame ) :

 

Standard: America Standard, Australia Standard, England Standard, China Standard, etc.

Software: SAP2000, Auto CAD, PKPM, RSTAB, PROE, MTS, Tekla Structures( Xsteel) , 3D3S, Tarch, etc.

 

5. Our seaworthy packing system for steel frame buildings  ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How to control the quality of your steel frame buildings  ( made of steel frame ) ?

a. quality of the design: think about possible problems in advance and provide a high quality design solution.

b. quality of the raw material: choose the qualified raw material from the top steel mill in China.

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

2) How to deal with quality problems of your steel frame buildings  ( made of steel frame ) ?

Warranty is 2 years. Within the warranty period, we will responsible for all quality problems caused by production.

 

 


Post Buying Request