user login

pre engineered steel structure and construction steel frame at Sri Lanka area

1000.0 USD
Min. Order: 100 Metric Ton
Trade Term: CFR
Payment Terms: L/C
Supply Ability: 3000 Ton/per Week
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-202
Means of Transport: Ocean
Brand Name: HX
Certificates:: 1. ISO9000, ISO14000, ISO18000 by BV France. 2. EN-1090 CE certificate, American CWI, European TWI, European IWE
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Drawing Design: by client or by us
Software used: American SAP2000 American STAAD-Pro Finland Xsteel
Service Offered: Design, fabrication, packing, transport, erection
Production Capacity: 3000 Ton/per Week
Packing: Sandwich panels covered with plastic film
Delivery Date: usually as customers'order
Show

Product Description

1. Our excellent design team will design the Steel building ( made of pre engineered steel structure ) for you . If you give the following information :

1 ) Data for design

   Wind speed ( KM /H )

   Snow load : ( KG / M2 )

   Rain load ( KG / M2 )

   Earthquake load if have

   Demands for doors and windows

   Crane ( if have ) , Crane span , crane lift height , max lift capacity , max wheel pressure and min wheel pressure !

 

2 ) Material quality

   Windows and doors quantity , size and location

   Roof and wall material , sandwich panel or corrugated steel sheet ( steel sheet can not heat insulation ) 

 

3 ) Type

    Size -- width , length , eave height and roof slope

   Single slope or double slope

   Single floor , double floor or multi floor

 

2. Why choose us as your steel structure supplier:

Founded in Shandong province, we are a professional manufacturer of steel structure building, workshop, warehouse, high rise building, industrial steel structure, civil steel structure, sandwich panel and profiled steel with ISO9001, SGS and CE certification.

We once made 30, 000 SQM prefabricated building in 16 days for a major buyer in Saudi Arabia. And, we manufactured 200, 000 square meter of prefabricated steel building monthly for post-Wenchuan Earthquake reconstruction. Our daily capacity is large 5, 0000 square meter and this is how we manage it:

1) 200, 000 square meter of factory space

2) 10 production lines for our prefabricated building series, 960 workers

3) 200 workers in charge of overseas construction

4) Our sales representatives can reply to your inquiries within eight hours in English, French and Japanese.

5) Two hundred workers oversee overseas construction.

6) We passed quality tests by India Adani Power, Hyundai Steel, China Construction Group, China Railway Construction Group and other biggest companies in the world.

 

3. Project case- South Africa Light Pre-engineered Building, 7000SQM, 2011:

South Africa workshop project

usage: steel pipe production workshop

length 252M X width 27.5M X height 11M, with a crane of 30 ton, the crane sling height is 7M. The workshop adopt Frame bent structure, lattice form column. Roof and wall surface is single steel sheet, no heat insulation, the bottom of wall has brick wall that 800 mm height and aluminum windows that 1.8m height, skylight sheet on roof for lighting.

Client issue the order to us within 1 week after visit our factory, our hardware and ISO management system leave deep impression to them. Now, we have finished more than 6 orders for this client.

 

4. We found international surface treatment system for the Steel building ( made of pre engineered steel structure ) :

We got NACE 1 and 2 level certificate as per American standard.

We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000m2 fully-enclosed painting workshop and 20, 000 m2 enclosed packing workshop.

 

5. Our seaworthy packing system for Steel building ( made of pre engineered steel structure ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Do you offer service for installation ?

Re: We will give detailed installation drawings and direction info for free. And if you need, we could also send engineers as installation director even a team.

 

2) What should I provide to build a Steel building ( made of pre engineered steel structure ) ?

A: So easy! Design drawing would be a better reference for us. However, you will

never mind if you don't have any. Simply notify us your requirements, such as the

area, wind load, usage of the warehouse etc. Before long, you' ll possess an amazing design.

If you have any new need, please provide your drawing paper or technical parameter for us reference, we will quote for you more precisely and accordingly.

 

3) Is the Steel building ( made of pre engineered steel structure ) erection quick ?

Yes, Steel beam, steel column, crane beams, purlins, support, wall beam, they are prepared in a factory, they are installed only need to connect with bolt on site, this installation is quick and convenient, Only need to provide the installation drawings.

 

 


Post Buying Request