user login

Pre-engineered steel building and steel building construction outdoor

1000.0 USD
Min. Order: 50 Metric Ton
Trade Term: CFR
Payment Terms: L/C
Supply Ability: 9000 Ton/per Month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-403
Means of Transport: Land
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Welding standard: AWS D1.1
Design& quote: We can make design and quotation according to your require or your drawing
Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc
Specifications: Main Steel: Q345B, Q235B Column&Beam: Welded or Hot rolled H-section Wall&Roof: EPS, Rock wall, PU sandwich, corrugated
Production Capacity: 9000 Ton/per Month
Packing: Bolts and accessories loaded into wooden box
Delivery Date: 15 to 40 days
Show

Product Description

1. Data of the Pre-engineered steel building ( made of steel frame ) :

Specification

Material :

Grade Q235 , equivalent to ASTM A36

Grade Q345 , equivalent to ASTM A572

Section :

Any product shape according to customer's requirements

Certification :

ISO quality system , Chinese GB50221 - 2001

Sand Blast :

SA 2.5 Sand blasting

Welding Technology :

Single level butt welding , fillet welding by electric arc welding , 

and Gas shielded welding

Surface treatment :

Hot dip galvanized , Epoxy zinc rich primer

Standard : ISO1461 ( 1999 ) , JIS H 8641 - 1999 , ASTM A 123 / A 123M-02

Welding Testing

Ultrasonic Testing , X-ray Testing

Manufacturing Technology

Drilling , Cutting , Assembling , Welding , Rectification , Testing etc

 

 

2. Applications of steel structure:

Structural steel fabrication have become increasingly and widely used at the workshops, warehouse, Pre-engineered steel building ( made of steel frame ) and other industrial and civil architectures. For example, single-span and multi-span gantry light-frame structures, exhibition Hall, industrial steel frame, Office buildings, Garage, Multy-story building, Hanger, Agricultural storage, Logistic centers, and all kinds of steel construction, etc.

 

3. Project case- Ningxia prefabricated steel structure workshop, 23000 SQM:

main structure:welding H steel or round steel

knee brace: Angle steel

roof ridge: corrugated steel sheet

Wrapping cover:color steel sheet

roof gutter: color steel sheet

rain spout: PVC pipe

doors: sliding sandwich panel door or metal door

windows: PVC OR ALUMINUM WINDOW

connecting: high strength bolts

characteristic: environment-friendly

lower cost and maintenance easily

 

4. Our technical team' s ability for Pre-engineered steel building ( made of steel frame ) :

1) We have 80 persons' design team with more than 20 years experience, who can provide the most reasonable proposal. We can offer AutoCAD proposal drawing according to your ideas, customer's drawing are welcomed. Clear span without middle column can reach to 30 meters.

2) 3D photos for pre-view how' s your building looks like is available.

3) Blueprint drawing is available.

4) Professional production drawing control excellent quality.

5) Very details installation drawing. Engineer on-site guidance is available

 

5. Our seaworthy packing system for Pre-engineered steel building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How to buy your ideal Pre-engineered steel building ( made of steel frame ) ?

A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, balance before loading by TT.

 

2) What is the delivery time of Pre-engineered steel building ( made of steel frame ) ?

A: It all depends on the order quantities. Usually, delivery time will be within 1 to 2 months.

 

3) How to install after the goods arriving destination ?

A: We will provide detailed erection dwgs to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.  

 

4) Q: Does your steel building can only be used in residential building ?

A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, etc.

 

 


Post Buying Request