user login

Artificial turf bonding process

59.0 USD
Min. Order: 10 Square Meter
Trade Term: FOB
Payment Terms: Paypal, L/C, D/P, D/A, T/T, Money Gram
Supply Ability: 10000
Place of Origin: Jiangsu

Company Profile

Location: Changzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Model No.: 308814
Means of Transport: Ocean
Type: Grass
Style: Artificial Crystal
Brand Name: Golden Moon
Production Capacity: 10000
Packing: express
Delivery Date: 30
Show

Product Description

Specific construction process:


1. Gluing: requires a brush in its surface brushing thickness uniformity, can not be repeated coating, otherwise there will be bubbling phenomenon, or even fall. Bottom cloth coated with glue, strictly control the thickness of the glue, pay attention to the appropriate glue, the coating should be applied to the bonding of the two bonding surface.


2. Adhesive: according to the then temperature, humidity, pressure and other conditions of the real impact, reasonable control of drying time. Generally within 10-30 minutes after the glue, mortar to eighty-nine into dry to touch non-stick is appropriate. Bonding requires a one-time alignment. Do not move the bonded object back and forth after bonding.


3. Press: After the glue is good, remove its surface debris, with a special rubber hammer from the adhesive to both sides of the force hammer, so that the surface of the full contact with dense, more solid bonding.


4. Curing: the curing time is generally three days, the final strength is generally measured for ten days. Therefore, during curing must pay close attention to its maintenance, to avoid too much exposure, flooding and movement, in order to achieve the best state of bonding.


5. After cleaning, do not rub the quartz sand and rubber particles before the site of the turf cut debris for cleaning.


Post Buying Request