Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW |
Payment Terms: | Paypal, L/C, D/P, D/A, T/T, WU, Money Gram |
Supply Ability: | 20000pcs/month |
Place of Origin: | Henan |
Location: | Luoyang, Henan, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Distributor/Wholesaler |
Model No.: | YT-M-003 |
---|---|
Means of Transport: | Ocean, Air |
Cabinets Type: | Vertical |
Drawer Type: | Legal |
Material: | Metal |
Special Features: | Mobile |
Brand Name: | YUYITENG |
S: | H2300*W900*D560mm |
Production Capacity: | 20000pcs/month |
Packing: | standard export 5 layer cartom packing |
Delivery Date: | within 25 days after receipt the payment |
Name | Metal Mobile Library Filing Document Shelving Furniture |
Model No. | YT-M-003 |
Size | H2300*W900*D560mm |
Structure | Easy assembly |
Thickness | 0.8-1.5mm cold rolled steel plate |
Loading Weight | 80kg/layer |
OEM/ODM | Accepted |
Function | Document stroage, office mobile filing cabinet,display cabinet, etc |
Details
Good quality cranking bar,easy operation.
The rubber strip with a good performance of sealing,buffer,dustproof,moistureproof,etc.
Transmission mechanism by using 428 type motorcycle chains and precision plane bearings, runs felxible and smooth.
With loading bearing shelf set on the bottom, normal type lateral plate two sides, a bookend set inside. Concise design and smooth style , the shelf has a good air interior circulation.
Installation Process
1.Approval the ISO9001&ISO14001 quality inspection;
2.High quality cold rolled steel plate;
3.Double bearings design to avoid the imbalance problem;
4.The shelf has been tested to prove that the ratio of the driving force and the loading weight is 1:1500, that is, the strength of 1kg is enough to drive the load of 1500kg;
5.The surface is covered with environmental electrostatic powder coating to ensure pure color and smooth surface without crystallization;
6.The design of backboard divides the shelf board into double;
7.The design of hanging panel avoids files dumping and is convenient to sort out;
8. High quality hardware accessories.
9.Concealed and practical anti-dumping device and braking device on the bottom of the shelf.
10. Between each column is equipped with sealing devices, on the top of frame body is equipped with dust-proof plates and the bottom has a closed rat guard plate.
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods with packing belts and plastic films.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB , CIF.
Q4. How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but buyers have to pay the sample cost and the courier cost.