Min. Order: | 1 Piece/Pieces |
---|---|
Place of Origin: | Guangdong |
Location: | Dongguan, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | customization |
---|---|
Means of Transport: | Ocean, Air, Land |
Brand Name: | YIZE MOULD |
Packing: | Foreign logistics (DHL, FEDEX, UPS, TNT) |
Delivery Date: | 7 to 10 production days |
High Precision Stamping Mold
yizemould921108
Product Information
Product name | precision stamping mould components |
Material | imported material:SKD11,SKH9,SKH51,SKH55,high-speed steel,special material can customize |
Grinding precision | 0.001mm |
Surface roughness for EDM | Ra 0.04 |
EDM precision | 0.002mm |
Grinding angle clearness | 0.002mm |
MOQ | 1 PC |
Production Information
Product accuracy | diamension tolerance ±0.001mm ,axiality within 0.002mm,roundness withing 0.0015mm,surfacae roughness wthin Ra 0.025,straightness within 0.002 |
Technique standard | according to national standars GM,JIS,DIN,AISI,ect. and other national standard |
Technique advantage | grinding parts with precision less than 0.002,precise EDM parts with precision less than 0.005 |
Production equipment | all machinery used from import ,with EDM 15 sets,grinder 15 sets,,wire-cutting 3 sets,CNC 2 sets,milling machine 1 set |
Our service | grinding process,grinding surface process,electro-discharge(wire EDM),CNC EDM,mirror EDM,CNC processing,precision mold parts process |
Business steps
1.Sample/Drawing We need your detail require clearly.
↓
2.Negotiation Material,price,delivery time,payment term ,etc.
↓
3.Place order According your own design or choose our design.
↓
4.Mould design We will communicate&exchange the opinion with you during making drawing.
↓
5.Tooling mould After customer approve the mould design will start making mould.
↓
6.Mould process Provide photos for customer show them tooling process.
↓
7.Sample confirm Send you sample for confoirm it ,if not satisfied by customer.we modify mould .
↓
8.Delivery mould Delivery mould after customer approve sample and arrange shipment
Why choose us ?
1.16 steps of strict process in the elaborate production to make
perfect quality of mould components
2.Depending on advanced technology, mould lifespan can be multiplied.
3.Armed up with advanced equipment from Japan and an excellent
production team.
4.Rapid delivery(7~10 days)
5.Personal attention to details
more on our website