Min. Order: | 10 Piece/Pieces |
---|---|
Trade Term: | FOB,CFR,CIF,EXW |
Payment Terms: | Paypal, L/C, D/P, D/A, T/T, WU |
Supply Ability: | 5000 pcs per week |
Place of Origin: | Zhejiang |
Location: | Wenzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Distributor/Wholesaler |
Model No.: | TXC017 |
---|---|
Means of Transport: | Ocean, Air |
Application: | used as linkages of pipes for the transportation of water ,oil, gas |
Steel Grade: | 200/300/400/ALLOY/NICKLE ALLOY |
Welding Line Type: | Welding, Clamp, Weld, Thread |
Production Capacity: | 5000 pcs per week |
Packing: | standard package or as requirment |
Delivery Date: | 10 days after we got paid |
Product Description
Material | 300s: 301,302,303,304,304L,309,309s,310,310S,316,316L,316Ti,317L,321,347 200s: 201,202,202cu,204 400s: 409,409L,410,420,430,431,439,440,441,444 Other: 2205,2507,2906,330,660,630,631,17-4ph,17-7ph, S318039 904L,etc Dup: S22053,S25073,S22253,S31803,S32205,S32304 Spec: 904L,347/347H,317/317L,316Ti,254Mo |
Size | 1/8",1/4",3/8",1/2",3/4",1",1-1/4",1-1/2",2",2-1/2",3",4",5",6" |
Standard | ASTM,ASME,EN,JIS,ISO,DIN,GB |
Nominal Pressure | 150lbs |
Certificate | ASTM,ASME,EN,JIS,ISO,DIN,GB |
Function | Connect the pipeline |
Application | They are Widely used as linkages of pipes for the transportation of water,oil, gas and every kind of corrosive suitable for stainless steel. |
Production Process | Investment Casting, CNC lathe, Test, Cleaning, Packing, Storage |
Packing | Be Packed in standard export polybag, carton and fumigation-free pallet |
Delivery Time | Within 7-25 Days after receipt of advance payment. |
Trade Term | FOB/ CIF/ EXW Shanghai Port |
Payment Term | 1)30% T/T down payment, the balance against the copy of B/L. |
2)L/C | |
3)D/P | |
Pipe Fitting type | 90 Degree Elbow, 45 Degree Elbow, 90 Degree street Elbow, Tee, Reducing Tee, Cross, FF/FM/MM Union, Barrel Nipple, Thread Nipple, Welding Nipple, Half Coupling, Full Coupling, Reducing Coupling, Socket Banded,Hose Barb Fitting, Hexagon Nipple, Hexagon Bushing, Hexagon Cap, Round Cap, Y-Strainer |
Note | We can Change the design as per the client's requirement. |
We can Produce stainless steel screwed pipe fittings, ball valves, check valve, gate Valve, globe valve and camlock etc. Pipeline equipments for your choice. |
Chemical Composition of Material | ||||||
Material Composition | 201 | 202 | 304 | 316 | 430 | |
C | ≤0.15 | ≤0.15 | ≤0.08 | ≤0.08 | ≤0.12 | |
Si | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | |
Mn | 5.5-7.5 | 7.5-10 | ≤2.00 | ≤2.00 | ≤1.00 | |
P | ≤0.06 | ≤0.06 | ≤0.045 | ≤0.045 | ≤0.040 | |
S | ≤0.03 | ≤0.03 | ≤0.030 | ≤0.030 | ≤0.030 | |
Cr | 16-18 | 17-19 | 18-20 | 16-18 | 16-18 | |
N | 3.5-5.5 | 4-6 | 8-10.5 | 10-14 | ||
Mo | 2.0-3.0 | |||||
Mechanical Property | ||||||
Material Item | 201 | 202 | 304 | 316 | ||
Tensile Strength | ≥535 | ≥520 | ≥520 | ≥520 | ||
Yield Strength | ≥245 | ≥205 | ≥205 | ≥205 | ||
Extension | ≥30% | ≥30% | ≥35% | ≥35% | ||
Hardness (HV) | <253 | <253 | <200 | <200 | ||
Company Information
Wenzhou Taixin Stainless Steel Co., Ltd is founded in 1998, Taixin now covers a total landing Area 320,000 square meters and more than 300 employees.
We have Developed a full set of equipment to offer customer high quality materials with Very competitive price.
the stainless Steel pipe tube supplied by wenzhou taixin stainless steel co.,ltd will help You enjoy good quality and expand market.
Package
with Plastic cap to protect both ends
Plastic bag wrapped outside pipe
Woven bag wrapped outside pipe
All our products are packed, stored, transported according to the international Regulation.
the tubes are wrapped with anti-rust paper and steel rings to prevent Damage. Identification labels are tagged according to standard specification or Customer's instructions. Special packing is available as per customer's Requirement.
Plus, ply wooden box are available for special protection. Other kinds of Packing can be offered if request.
FAQ
Q: Are you trading company or Manufacturer?
A: We are factory.
Q: how long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do Not pay the cost of freight.
Q: What is your terms of payment?
A: 30% T/T in advance,balance before shippment.
If you have another question, pls feel free to contact us freely.