user login

Prefabricated steel housing project

39.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CFR,CIF,DAT
Payment Terms: Paypal, L/C, D/A, T/T
Supply Ability: Prefabricated building/Customized
Place of Origin: Guangdong

Company Profile

Location: Foshan, Guangdong, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Model No.: Steel structure PSHP
Means of Transport: Ocean
Brand Name: SBS
Production Capacity: Prefabricated building/Customized
Packing: non-packed or steel frame packed
Delivery Date: 20-45 days
Show

Product Description

The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate.

While modular homes and housing developments may be great options for some homebuyers, metal building homes are growing in popularity across the nation due to many benefits including cost savings, durability and the ability to custom design steel houses without a costly architect. For younger homeowners seeking to save money while still making a longstanding investment in their property, metal houses may be the most logical option.

1) Features

1. Highest quality metal and components, solid H-Beam Construction.

2. Energy saving, earthquake proof, fire proof and water proof.

3. Safe, durable, comfortable, flexible and environment friendly.

4. Attractive appearance, comfortable, sound insulation.

5. Cost effective, Virtually Maintenance Free.

6. Easy to delivery, fast construction.

3.Advantages

1.Stable and Aesthetic

2.Structure is durable for 50years

3.Fast and easy to install

4.Extensive Applications: Storage, Warehouse, Exhibition Hall,Terminal Building, Stadium, Theater, Special-shaped Buildings, etc

5.High anti-rust performance

6.Flexible composition: Doors and Day-lighting roof could be  installed at any position

4. Guidance installation

Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:

Customer should provide:

1) Translator or assistant on site

2) All costs raised including: 
A. visa fee

B. Round trip flight ticket

C. Accident insurance for the supervisor during the period

D. Accommodation

E. Daily meals

F. Internet

G. Local traffic fee (if any)

3) The customer should pay the engineer with supervision fee, which can be  negotiated and decided by both.

4) Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.


Post Buying Request