user login

electric hydraulic remote control grab bucket for bulk

10000.0 USD
Min. Order: 1 Piece/Pieces
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: Paypal, L/C, D/P, D/A, T/T, WU, Money Gram
Supply Ability: 50 sets /year
Place of Origin: Shanghai

Company Profile

Location: Shanghai, China (Mainland)
Business Type: Manufacturer, Trading Company, Distributor/Wholesaler, Service, Association

Product Detail

Model No.: Enjue-1
Means of Transport: Ocean
color: customized
application: all
power: electric hydraulic
HS code: 84314100
Production Capacity: 50 sets /year
Packing: nuded
Delivery Date: 60 days
Show

Product Description

25Ton Wireless Remote Control Grab Bucket For Marine Grab In Stock
It is a merging of the radio remote control technology into the single rope grab for handling of bulk materials. It is particularly designed for operation with single-hook crane and ship crane, with reliable performance and easy operation procedures.The grab could be open and unload materials from any position in the air.
American Welding Society,all important welds are carried out in accordance with welding procedures. After welding, a certain amount of NDT control is carried out. We especially set up hydraulic department to ensure smooth production and high quality, all structure design and distribution of hydraulic system are taken charge of hydraulic department. All hydraulic elements are imported international well-known brands in machinery industry. Material of scoop is Q345B, material of all axes is 42CrMosf, by tempering and grinding, lips's rigidity should be reach HRC50. Ensure 24-hour test, ensure the normal operation of grab, after delivery. our wire rope- fixed head, four flange bolt-lifting eye, four brace-support scoop. Only suitable for single hook crane,The grab could be open and unload materials from any position in the air.
1.Pre-sale services:  

a: Design customised project for clients.

b: Design and manufcture products according to clients special requirement.

c: Train technical personnel for clients.

2.Services during the sale:

a: Help clients to find reasonable freight forwarders ahead of delivery.

b: Help clients to draw solving plans.

3.After-sale services:

a:Assist clients to prepare for the construction scheme.

b:Install and debug equipment.

c:Train the first-lin operators.

d: Examine equipment.

e: Take initiative to eliminate the troubles immediately.

f: Provide techical exchanging.
---Closing Cycle:
    When the grab is opening, the moving board is connecting with top roof beam, and separate with down roof beam, at the that time, the hydraulic circuit system is opening, and the piston of hydraulic vat was pulled out by moving board. when grab the goods, the hook of the crane go down, the moving board go down along the hydraulic vat with the piston of the cylinder, when the moving board touch the stroke switch on the down roof beam, the stroke switch stop the electromagnetism valve to stop the hydraulic oil . The hook of the crane goes up with moving board and down roof beam, to make the grab close.
 ---Opening Cycle:
Press the radio switch, send the message to the receiver, then the electromagnetism valve open the hydraulic circuit system, the hydraulic vat was extended because of the gravity of goods and down roof beam, the down roof beam was separated from moving board, to make the grab open , and the grab can do the next closing cycle.
Within 18 months after the grabs delivered or 12 months after the operation date, we provide global sales service.(unusual employ attaint is exception, The quality ensured of import part such as hydraulic valves and pipe adapter the duration of insurance of supplier quality according to importing)
 
25
25T Remote-Control Bulk grab Specification
,/Grab type:
:25/ 25T Remote-Control Bulk grab
:YK25[8-10-12]10B-00
 
,:Technical questionnaire
:25t fit to 25t cran/size of grab:refer drawing
/ Empty grab opening time:12s  / cubage:6-12m3 
/ Empty grab closing time: 18s  / Rating burthen:~16t
/density:~1.0-2.0t/m3            / Grab dead weight:~9.2t
 
,/Technics standard:
 
1.Q345B,42CrMo,.HARDOX400,HRC50..Material of scoop is Q345B, material of all axes is 42CrMo, by tempering and grinding. Material lips is HARDOX400,and the rigidity should be reach HRC50.O ,the part's Material according to drawing.
 
2.,,,,,.The holes of up beam,pole,low beam and scoops are bored by machine, it can ensure the concentric,detailed allowance error according to drawing request.
 
3..,160um.All steel will blasting shot before machining. After completion of the production deal with the surface coating, Thickness of coating greater than 160um.
 
4.,.,.The activities of nodes need to consider lubrication, the attention of the design, such as lubricating device should not be bump. Installation of hydraulic cylinders to be used in spherical joints, and have the lubrication.
 
 
5.,,.3.All important place should go to beveling,and welded joints carry on the loss less crack detection, and the grade of welded joints must reach first-level.
 
6.,.The hydraulic system
 
And the part like the hydraulic cylinder,the hydraulic valve and so on will select famous factory's manufacture.
 
7.,,.,.The grab should act accurately, the operation is flexible, do not have the greatly sound. The double clamshell grab must design has the automatic balanced organization, causes grab double clamshell to opening or the closing time synchronization.
 
8.10mm,3mm.,.Whole dimension deviation of grab should less than 10mm, mostly install dimension deviation less than 3mm.If there are some special requests, machining according to drawing.
 
9.,.,3().
All the grabs are directly linked to the hooks of the cranes. When designed the grabs should match size. The grabs are connected with the hook of the cranes in links. The strength of the links can lift the 3 times weight in security (including the dead weight and the holding material weight).
 
10..The installation position of each vulnerable must be considered the replacement the conveniences
 
11.,"",,.Each grab must be painted related marking in conspicuous place, including "ENJUE"nameplate,the grab serial number , rating burthen and so on.
 
12..Other end mentioned technological requirement according to the Ministry of Communications related grab manufacture standard and enterprise standard execution.
 
,
1)/SWL:                      SWL25 T
2)./Sheave dia:                650mm
3)./Wire rope dia:            36mm
4)./Stroke:                    -1529mm
5)./Max. width when open:      3828mm
6)./Working height:             10000mm
7).()/Dead weight:                ~9.2T
 
 
,/materials;
1)./SCOOP                                       Q345B
2)./Stay bar:                                      Q345B
3)./Leave structure one of the bolster:        Q345B
4)./Pulley:                                        Q345B hot rolled
5)./Pulley axes:                                 42CrMo,strengthened
6)./Pulley axletree                      Famous-brand bearing of China
7)./Axes:                                         42CrMo,strengthened
8)./Bushing:                          ZGMn13
 
9).,/Bottom lips                      HARDOX500
10)./parts list                             /chart


Remote control

APLLO

Sealing parts
PARKER
AMERICA

solenoid valve
VICKERS
AMERICA

Hydraulic oil pipe
 EATON,MANULI
,

batteries
STK
AMERICA

Cylinder

Local famous brand

Wire rope

 Local famous brand
OthersRefer above

 
 
 
,/Techniques:
.(:1,,.2,,, )
Stencil plate unloading is cut with numerical control.(the merit: 1, slinky & indentation has no stress; 2,the aperture between the welding plates is thin, the welded stress is small and the welding line will not crazing.
2.(,)
It is protected by gas when welding, the welded stress is mall and the welding line will not crazing.
,,,,
The holes of up beam, press rods, low beam and scoops are bored by machine, it can ensure the concentric.
 
,/paint:
1., Sa2.5
All the surface of the steel structure is sand-shot to Sa2.5 grade.
2.80μm, ,80μm
Primer coating app. 80μm, top paint app. 80μm.
3.
Color of top paint: according to the customer.
 
 
,/ Work theory
,,,.,,,,,.,,.
---Closing Cycle:
    When the grab is opening, the moving board is connecting with top roof beam, and separate with down roof beam, at the that time, the hydraulic circuit system is opening, and the piston of hydraulic vat was pulled out by moving board. when grab the goods, the hook of the crane go down, the moving board go down along the hydraulic vat with the piston of the cylinder, when the moving board touch the stroke switch on the down roof beam, the stroke switch stop the electromagnetism valve to stop the hydraulic oil . The hook of the crane goes up with moving board and down roof beam, to make the grab close.
 
---Opening Cycle:
Press the radio switch, send the message to the receiver, then the electromagnetism valve open the hydraulic circuit system, the hydraulic vat was extended because of the gravity of goods and down roof beam, the down roof beam was separated from moving board, to make the grab open , and the grab can do the next closing cycle.
 
 
,/Other technical parameter
1./working voltage :       24/24V DC
2./Remote-Control distance:100()/>100m(beeline)
3./frequency :    /emission  321MHz ;/incept  331.7 MHz
4. :Charger 110-220/input 110-220V ; 2.2A /output2.2A
5. /Batteries  120(,20ºC)/Dry Cell 45A  Charging life is 120 hours non stop working (DC12~24V, new batteries)
 
Remark:
1. ,,.There is a buffer device equip on the valve of the hydraulic system on our company;s grab ,it is in order to lower the impact force when opening the grab.,thereby extending the service life of hydraulic cylinder system effectively.
 
,2-4/ Each 2-4 grab include below parts for free :
1)/hydraulic seal    1/set
2)/tools            1/set
3)remote control and receiver   1set (,)
4)/battery            1/set
5)/battery charge  1/set
    6)/grease nipple    20/unit
 
,/ Quality ensured:
,, (,,,).Within 18 months after the grabs delivered or 12 months after the operation date, we provide global sales service.(unusual employ attaint is exception, The quality ensured of import part such as hydraulic valves and pipe adapter the duration of insurance of supplier quality according to importing),
 
Documents
 
1),,,,, .
 When the supplier delivers goods, offer a crab bucket of general drawing, quick-wear parts pictures, part catalogue, user manual and maintenance manual etc.
2),
One Copy of Product Qualification Certificate
CCS BV RINA.(If request)
 
 



Post Buying Request