user login

Galvanized square steel pipe tube and pre galvanized steel pipe

600.0 USD
Min. Order: 20 Ton
Trade Term: FOB,CFR,CIF,EXW
Payment Terms: L/C, T/T, WU
Supply Ability: 1000ton
Place of Origin: Hebei

Company Profile

Location: Shijiazhuang, Hebei, China (Mainland)
Business Type: Trading Company

Product Detail

Model No.: Q235
Means of Transport: Ocean, Air, Land, train
Product name: Galvanized Steel Pipe
Keyword: galvanized steel pipe,galvanized pipe,galvanized tube
Material: 10#,20#,45#; Q195-Q345;A53 GR A/B; SS330-SS500,ST37-ST52,S235JR,S355JR
Length: 6m or as the client's requirements
Technique: welded or seamless
Surface: galvanized
Shape: Square. Rectangular.Round
Pipe Ends: Plain, beveled
Usage: Water, Gas, Stream, Combustible Fluids And Other Liquid Delivery
Inspection: With chemical composition and mechanical properties analysis
Production Capacity: 1000ton
Packing: Packag by bundles or as customer's requirements
Delivery Date: 10-25days after receiving deposit
Show

Product Description

Product Namegalvanized steel pipe,galvanized pipe,galvanized tube
StandardBS1387, BS EN10219, ASTM A53, GB/T3091
Material10#,20#,45#; Q195,Q235,Q345; A53 GR A/B; SS400,SS330,ST37,ST42,S235JR,S355JR,SS500,ST52
OD1/2"-24",5.15mm-714mm
Wall Thickness1.2-26mm
Length2-12m,or according to the customers' requests
Zinc Weight

Electric galvanized:120g/m²;

Hot dipped galvanized:230g/m²,400g/m²,500g/m²,550g/m²

or as your requirement

Surface Treatment1)Bared;2)Black Painted(varnish coating);3)Galvanized;4) Oiled;5) PE,3PE, FBE,corrosion resistant coating,Anti corrosion coating
TechniqueElectronic Resistance Welded (ERW);Electronic Fusion Welded (EFW);Double Submerged Arc Welded (DSAW)
Application1)low pressure liquid, water, gas, oil, line pipe
2)construction,Ornament
3)fence,greenhouse,door pipe
Packing

1) Bundle,        

2) In Bulk            

3) Bags                    

4) Clients' Requirements

Trade termEXW, FOB, CFR, CNF, CIF
Payment termT/T, L/C; 30% TT prepaid and 70% TT paid before shipping or receiving copy of B/L
Delivery Timewithin 20 days after receiving deposit or according to quantity
Post Buying Request