Min. Order: | 10 Piece/Pieces |
---|---|
Payment Terms: | L/C, T/T, WU |
Supply Ability: | 1000PCS PER WEEK |
Place of Origin: | Zhejiang |
Location: | Ningbo, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | SI63X100 |
---|---|
Means of Transport: | EXPRESS, Ocean, Air, Land |
Brand Name: | WITPC |
Standard Type: | ISO6431,ISO15552 |
Bore Size: | 63mm |
Stroke Length: | 100mm |
Motion Pattern: | Filtered Air |
Working Action: | Double Acting |
Compression Pressure: | 1.5MPa |
Max. Operating Pressure: | 1.0MPa |
Min. Operating Pressure: | 0.1MPa |
Buffer: | Air Buffer (Standard) |
Condition Temperature: | -5~70℃ |
Production Capacity: | 1000PCS PER WEEK |
Packing: | WITPC NEUTRAL BOX |
Delivery Date: | 5 DAYS AFTER PAID |
WIT pneumatic --- SI63X100 (ISO6431 STANDARD AIR CYLINDER)
1.Brief Introduction:
(1) Designed with new seal material and buffer structure.
(2) With a simple structure,light weight,low starting pressure.
(3) Running balance,good sealing performance,long life,easy maitenance etc.
(4) Used in light industry,chemical industry,gold,mechanical,electronic and other industries widely.
(5) There are a variety of component option to attend different installation requirements.
2.Techincal parameters:
(1) Motion Pattern - Filtered Air
(2) Working Action - Double Acting
(3) Compression Pressure - 1.5MPa
(4) Max. Operating Pressure - 1.0MPa
(5) Min. Operating Pressure - 0.1MPa
(6) Buffer - Air Buffer (Standard)
(7) Condition Temperature - -5~70℃
3.Cylinder Installation Instructions:
(1) Before installation,be sure if the cylinder was not damaged during transportation.check if connecting parts were loose,etc.
(2) When installation,the cylinder piston rod shall not with stand eccentric or radial loads,the load must be consistent with the direction of piston rod axis.
(3) When cylinder installation,especially for long stroke cylinder,it must use level instrument for three-point position calibration.
(4) Before the pipe connects into air intake,it should clear pipe's burrs,pipeline without corrosion,after cleaning up and checked,can be installation.
(5) Speed adjustment: firstly adjusting speed control valve (one-way throttle) in the middle,gradually adjusting the output pressure of regulator,when cylinder speed is close to pre-determine speed,it can ascertain working pressure,and then using speed control valve for fine tuning,Finally adjusting the buffer speed.
(6) After cylinder installation,in working pressure range,to operate 2-3 times without load,checking the cylinder before if is working normally.
(7) At high temperature or corrosive conditions,it should use the appropriate temperature or corrosion resistance cylinders.
(8) In the occasions of humidity,dust or water drop,oil,dust,welding slag,the cylinder should be protected with devices.
(9) In low-temperature environment,it should take anti-freeze measure to prevent water freezing of the system.
(10) If the cylinder is not used for a long time,pay attention to the surface oxidation,the intake and exhaust ports should be added plug dust protection.