user login

PP / Plastic Biaxial Geogrid

0.5 USD
Min. Order: 100 Square Meter
Trade Term: FOB,CFR,CIF,CIP,CPT,EXW
Payment Terms: Paypal, L/C, T/T, WU
Place of Origin: Hebei

Company Profile

Location: Shijiazhuang, Hebei, China (Mainland)
Business Type: Manufacturer, Trading Company, Agent, Service

Product Detail

Model No.: ht003
Means of Transport: Ocean, Air, Land
Brand Name: HUATAO
TYPE: BIAXIAL
Material: PP - polypropylene
Strength: 15/15KN/m -- 50/50KN/M
Width: Max 6 meter
Length: As Request
Packing: Paper Core, Waterproof membrane and woven fabrcic
Delivery Date: Within 7 days
Show

Product Description

PP / Plastic Biaxial Geogrid


Company: Huatao Group Limilted

Skype: huatao-group 

WhatsApp: +8617731189774 

Web: www  geosynthetic  biz

Email: sandy  geosynthetic  biz 


Description

Two-way stretch plastic geogrid appearance approximate square network-like structure, which is made of polypropylene as the main raw material, by extrusion, and then vertical and horizontal stretching a high strength geotextile material. The material in the vertical and horizontal have great tensile strength, is widely used in soft foundation reinforcement treatment.



Specification

1. Strength : 15/15KN/M -- 50/50KN/M

2. Width: from 2m - 6m

3. Length: as request

4. Package: paper core, black waterproof membrane

5. Loading: 20ft container, 40ft high container




Applications

1, all kinds of roads, railways, airports roadbed enhancement;
2, permanent foundation bearing large car park and terminal freight yard and other enhancements;
3, railway, highway slope protection, culvert enhancement;
4-way stretch geogrid slope secondary enhanced enhanced, and further enhance the soil, prevent soil erosion;
5, mining, tunnel reinforcement.



Construction method

Excavation of foundation bed, set the sand cushion (height of not more than 250px), rolled into the platform, laying grille, the vertical axis to be consistent with the direction of the main force, longitudinal lap 15-500px, lateral 250px, lap banding with plastic tape and laying on the grill every 1.5-2m with U-nails on the ground, laying geogrid should be promptly backfill material, laying geogrid layers depending on the technical requirements.



Geogrid construction process requirements

Geogrid paved surface should be relatively smooth, paving layer after passing the acceptance, in order to prevent the phenomenon of vertical skew, press width white line drawn in the pavement layers or hung, you can begin paving, and iron nails grille ends (each 8 m wide with a nail, uniform distance fixed).



After fixing the ends of the grid, with a paving machine to pull forward slowly grill shop, shop 10 meters long each artificial straightening and tensioning time, until the volume grid Puwan, holes and under the roll, operation with the former.
Puwan roll began rolling it again in the forward direction from the starting point of the roller with the 6T-10T. 

(Such as paving in the leveling layer in the upper layer and the surface, the steel roller roller is appropriate; such as grid laid directly on the concrete pavement with a rubber roller roller appropriate.)


Then shop: a roll as long as the unit segment length laid, after long segment shall be covered within the grid covered, and then check the overall paving quality, and then paving the next paragraph. The next section of paving, grille and grille can lap length 10-15CM and continue to move forward with the direction of the second paragraph after the shop or nails fixed wedge. And so on, with the former operating requirements.



Looking for ideal Pp Biaxial Geogrid Manufacturer & supplier ? We has a wide selection at great prices to help you get creative. All the Plastic Biaxial Geogrid are quality guaranteed. We are China Origin Factory of Biaxial Geogrid. If you have any question, please feel free to contact us.


Post Buying Request