user login

European Style Thermofoil Kitchen Cabinets With Blum Hinges And Slider Drawers

Place of Origin: Zhejiang

Company Profile

Location: Guangzhou, Guangdong, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: GHPAK-006

Product Description

European Style Thermofoil Kitchen With Blum Hinges And Slider Drawers

 

 

Success case

 

Location: Halifax, Canada
Type: Apartment
Date: 2012
Quantity: 35 sets
One-stop Project Service: Design, customized, installation
One-stop Product Supply: Kitchen, wardrobe, bathroom, door
 

Feedback from the project managers
 

"We have absolutely no hesitation to use MELONI again in our future projects" said a project manager. "We especially liked their good service. Goods were all professionally packaged and labeled. Excellent quality, no transit damage and installation went like clockwork."

 

 

 

Handling and loading and unloading must comply with the following provisions:

 

(1) handling should be light light, it is strictly prohibited and roll and vertical pieces must be on the back edge first.

(2) stone plank single block area of more than 0.25 m2, upright handling. Lifting tool for products in handling, the force must padding edge.

(3) wooden case packing products, with the hoisting equipment when loading and unloading

Comparison of PVC and wood

  • PVC is self colors for all kinds of color, but wood we have to coated

  • PVC is cheaper 25% to 40% than wood , real solid wood is extreamly expensive

  • PVC is termite and water proof and fire resistance , but real wood has no this advantage

  • PVC maintenance is free , but wood varnishing is a must in last stage

  • PVC producs labor cost is low , but wood is very high

  • PVC is easy to installation , wood takes at least 60dyas to finish goods

The form below shows lead time of different finishes need:

 

 

 

Kitchen Cabinet:

 

Solid wood finish 60 days
Wood veneer finish 60 days
Lacquer finish 35 days
Laminated finish 25 days
PVC finish 25 days
Acrylic finish 20 days
Melamine finish

20 day

 

 

 

 

 

Post Buying Request