user login

Two Colour Part 2k Injection Molding Process With Texture Surface

Place of Origin: Zhejiang

Company Profile

Location: Dongguan, Guangdong, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: JZY160118

Product Description

Tow colour part , Double Injection Molding , ODM service, Texture Surface

 

Double Injection Molding
 

 
 
 
 
 
Description

Part name double colour parts
Part Size Customized
Material ABS, POM,PP, PU,PC,PA66,PMMA,PVC, Nylon(+GF), Acrylic, PC+ABS, TPE, TPU, TPR, PEI, PFA
File format  .stp, .step, .dwt, .x_t
Process Quotation, Order, Tooling, Inspection, Mold Trial, Sample checking and sending, Mass Production, Inspection, Package, Shipment.
Surface treatment Mirror Polishing, Texture, Gloss, Matte, Rubber oil, Plating, Printing, Silk screen, Painting, Powder Coating.
Color Any color in RAL and PANTONE
QC 100% QC inspection during production and before delivery
Guarantee According to approval sample for mass production
Tolerance Per customer’s request.

 
Design

1. Professional Part design and Mould design team.
2. Design as per order part quantity, that will reduce cost.
3. Consider the assembling.
4. Make Rapid Prototyping for testing before tooling making

 
Company's strengths

1. Professional Team
2. Excellent equipment
3. Superior after sales service
4. High quality and competitive price

Certificate ISO9001:2008
Packing As per customer' s requirements protect the parts well during shipment

 
 
Our Advantage:
 
1) Impeccable ISO quality management system.
 
2) Clean room for food grade production.
 
3) More professional for double color & insert molding.
 
4) More professional for special engineering materials.
 

 
 

FAQ

 

1. Are you a factory?

 

Yes, we are professional manufacturer for Injection mold, Plastic Parts, Metal Stamping, Insert Molding and Value Added Products.

 

2. Does your company provide design service?

 

Absolutely yes. Our experienced engineers always give our customers useful suggestion to help them solve the problems that they encounter when designing and process the molds and products.

 

3. what should I do if I can not make sure the parts structure?

 

A prototype is useful, often just need 3-5 days.

 

4. How to control the quality?

 

We have an excellent quality control team and the advanced inspection equipment.

 

5. What about the after sale service?

 

Our professional engineers will provide all-round technical solutions.

 

6. What about the lead time?

 

Usually 25-35 days upon receipt your deposit payment; and we will send you the mould trailing samples for your approval first.

 

7. How to delivery the goods?

 

By air or by sea, both are ok.

 

 

Post Buying Request