Place of Origin: | Zhejiang |
---|
Location: | Dongguan, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | JZY160118 |
---|
Tow colour part , Double Injection Molding , ODM service, Texture Surface
Double Injection Molding
|
Part name | double colour parts |
Part Size | Customized | |
Material | ABS, POM,PP, PU,PC,PA66,PMMA,PVC, Nylon(+GF), Acrylic, PC+ABS, TPE, TPU, TPR, PEI, PFA | |
File format | .stp, .step, .dwt, .x_t | |
Process | Quotation, Order, Tooling, Inspection, Mold Trial, Sample checking and sending, Mass Production, Inspection, Package, Shipment. | |
Surface treatment | Mirror Polishing, Texture, Gloss, Matte, Rubber oil, Plating, Printing, Silk screen, Painting, Powder Coating. | |
Color | Any color in RAL and PANTONE | |
QC | 100% QC inspection during production and before delivery | |
Guarantee | According to approval sample for mass production | |
Tolerance | Per customer’s request. | |
|
1. Professional Part design and Mould design team. |
|
|
1. Professional Team |
|
Certificate | ISO9001:2008 | |
Packing | As per customer' s requirements protect the parts well during shipment |
Our Advantage:
1) Impeccable ISO quality management system.
2) Clean room for food grade production.
3) More professional for double color & insert molding.
4) More professional for special engineering materials.
FAQ
1. Are you a factory?
Yes, we are professional manufacturer for Injection mold, Plastic Parts, Metal Stamping, Insert Molding and Value Added Products.
2. Does your company provide design service?
Absolutely yes. Our experienced engineers always give our customers useful suggestion to help them solve the problems that they encounter when designing and process the molds and products.
3. what should I do if I can not make sure the parts structure?
A prototype is useful, often just need 3-5 days.
4. How to control the quality?
We have an excellent quality control team and the advanced inspection equipment.
5. What about the after sale service?
Our professional engineers will provide all-round technical solutions.
6. What about the lead time?
Usually 25-35 days upon receipt your deposit payment; and we will send you the mould trailing samples for your approval first.
7. How to delivery the goods?
By air or by sea, both are ok.