user login

builders scaffold construction scaffolding dimensions Scaffolding Frame

1000.0 USD
Min. Order: 1 Ton
Trade Term: FOB,EXW
Payment Terms: T/T
Supply Ability: 100000000 ton
Place of Origin: Tianjin

Company Profile

Location: Tianjin, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Model No.: 001
Means of Transport: Ocean
Production Capacity: 100000000 ton
Packing: BOX
Delivery Date: 7 days
Show

Product Description

builders scaffold construction scaffolding dimensions Scaffolding Frame

>Details of  walk through scaffolding H frame

 

1. A complete set of walk through scaffolding H frame usually include 2 pieces of H frames, 2 pairs of cross braces and 4 joint pins. 

 

2. When walk through scaffolding H frame is used for outside constructions, we usually used single body arranged method which can save you much time and material.

 

3. When walk through scaffolding H frame is used for normal duty balance and heavy duty balance, we use double body ranking arranged method or even four-body ranking arranged method which can be very stable and reliable.

 

4. Walk through scaffolding H frame is high protected painted which can prevent them from rusting and extend their working life.

 

5. Walk through scaffolding H frame  can also be mobile when you install a caster wheel at the bottom of each standard. 

 

 

Name

Walk through scaffolding H frame

Place of Origin

Tianjin,China

Brand name

 Walk through scaffolding H frame

Size

Many sizes or as your request

Main Material

Q235 Steel

Color

Orange,red,blue

Certificate

SGS

MOQ

1set

Payment

T/T,Western Union etc

Delivery Time

10-15 days after deposite

Packing

Loading in container or as the customer's request

Production capability

1000 tons per day

Main Market

Africa, South America, the Middle East and Asia

 


Post Buying Request