user login

Large Plastic Mold Injection Moulding Process Hot Runner Mould DME Strandard

Place of Origin: Zhejiang

Company Profile

Location: Dongguan, Guangdong, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: OEM

Product Description

 

Large Size Plastic Mold Injection Moulding Process DME Strandard Hot Runner Mould

 

 

Mould & Molded Parts Description

 

Wishmoulds Mold Description
Mold Type Plastic injection mold, overmolding, Interchangeable Mold, insert molding, compression mold, etc
Design software UG, ProE, Auto CAD, Solidworks, etc.
Main services Prototypes, Mold design, Mold making, Mold tesing,
low volume/high volume plastic production, Packing, Assembly.
Certificate ISO 9001:2008
Steel material 718H,P20,NAK80,S316H,SKD61, etc.
Plastic production Raw material PP,NYLON,PLA,AS,ABS,PE,PC,POM,PVC, PET,PS,TPE/TPR etc
Mold base HASCO ,DME ,LKM,standard
Mold runner Cold runner, hot runner
Mold hot runner DME, HASCO, YUDO,etc
Mold cold runner point way, side way, follow way, direct gate way,etc.
Mold strandard parts DME, HASCO, etc.
mold life >300,000 shots
Mold hot treatment quencher, nitridation, tempering,etc.
Mold cooling system water cooling or Beryllium bronze cooling, etc.
Mold surface EDM, texture, high gloss polishing
Hardness of the steel 30~60 HRC
Equipments High speed CNC, standard CNC, EDM, Wire cutting, Grinder,
Lathe, Milling machine, plastic injection machine
Lead time 25~30 days
Month Production 50 sets/month
Mold Packing standard exporting Wooden case

 

 

 

Wishmoulds injection molded parts Description
Design software UG, ProE, Auto CAD, Solidworks, etc.
Certificate ISO 9001:2008
Plastic production
Raw material
PP,Pa6,PLA,AS,ABS,PE,PC,POM,PVC, PET,PS,TPE/TPR, silicone rubber,etc
(flame retardant, UV as optional)
molded parts size As per your drawing or samples
Color According to your Panton number color or your samples
parts finish painting, chrome, silk sreen, thermo printing, etc.
Molded Parts features Free of flash, sink mark, blemishes, variation, etc.
Parts application Automative, Industrial, Household applicance, Vehicle,
Medical, Food processing, Agriculturaletc.
lead time 1 week
Packing bulk or individual pack, upon customer's demands with exported carton box.

 

 

how to make plastic molds

Post Buying Request