Min. Order: | 1 Ton |
---|---|
Trade Term: | FOB,CIF,EXW |
Payment Terms: | L/C, D/P, D/A, T/T |
Supply Ability: | 10000tons/month |
Place of Origin: | Tianjin |
Location: | Tianjin, China (Mainland) |
---|---|
Business Type: | Trading Company |
Means of Transport: | Ocean |
---|---|
Product name: | mct oil oilfield casing prices hot rolled square steel casing pipe |
Keyword: | oil pipe material |
Type: | Hot Rolled Hollow Carbon Pipe |
Material: | Q195/Q215/Q235/Q345 |
Name: | API 13-3/8" J55 casing pipe |
Surface: | Black Painted |
Shape: | Round Square. Rectangular |
Usage: | Oil Gas and Water Transport |
Length: | 5.8-12m |
End protector: | Plastic Pipe Cap |
Production Capacity: | 10000tons/month |
Packing: | according to customer's requirements. |
Delivery Date: | Shipped in 10 days after payment |
dalipu mct oil oilfield casing prices hot rolled square steel casing tubing pipe
Product Name:dalipu mct oil oilfield casing prices hot rolled square steel casing tubing pipe
Material:GR.B,ST52, ST35, ST42, ST45,X42, X46, X52, X56, X60, X65, X70,SS304, SS316 etc.
OD:114.30mm -508.00mm
Wall Thickness:5.21mm-16.13mm
Length:R1:6.1-7.32m;R2:8.53-9.75m;R3:11.58-12.80m;Less than 12m , or as buyer's requirements
Standard:API5L , ASTM A106 Gr.B, ASTM A53 Gr.B,ANSI A210-1996, ANSI B36.10M-2004 , ASTM
A1020-2002,ASTM A179-1990 ,BS 3059-2,DIN 17175 ,DIN 1630 ,DIN 2448
Certificates:API5CT, ISO 9001:2008
Surface Treatment:black paint, varnish, oil, galvanized, anti corrosion coatings
Marking:Standard marking, or according to your request.
Pipe Ends:Under 2 inch plain end. 2 inch and above Beveled. Plastic caps (small OD) ,Iron protector
(large OD)
Packaging:Loose package; Packaged in bundles(2Ton Max); bundled pipes with two slings at the both end for easy loading and discharging; End with Plastic caps; wooden cases.Or as buyer's requirements.
Test:Chemical Component Analysis, Mechanical Properties, Technical Properties, Exterior Size Inspection, hydraulic testing , X-ray Test.
Application:oil pipe; gas pipe;water pipe; sewage Transport
14. Port of Shipment:Tianjin Port,Tianjin, China
15. Date of Delivery:Shipped in 10 days after payment
16.Q: How long is your delivery time?
A: If there are stocks, take 5-10days to delivery for small quantity, and 30-40days for bigger quantity;If no stock, depends on the steel billet purchase,
Q: What about your payment term?
A: Usually T/T or L/C, 30% deposit and 70% before delivery.
Q: what about your standard delivery date
A: 30 days after receiving deposit .We are pleased to provide you with best services in consulting, purchasing,transportation, installation, and after-sales services.
17.We would like to establish long term business with any reliable partner in the world . Any interesting or questions, pls don't hesitate to contace us . Waiting for your kindly reply . Thanks
Nominal size | Outer diameter (mm) | Thickness (mm) | Inner diameter (mm) | Nominal diameter (mm) |
9-5/8" | 244.48 | 7.92 | 228.60 | 224.66 |
10-3/4" | 273.05 | 7.09 | 258.90 | 254.91 |
11-3/4" | 298.45 | 8.46 | 281.50 | 279.40 |
13-3/8" | 339.72 | 8.38 | 322.96 | 318.99 |