user login

Professional rough metal sand casting body part heat treatment surface

Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: Ottommo-sand casting-003

Product Description

Sand casting body part

Professional rough metal sand casting body part heat treatment surface

Description

Sand casting is different from investment casting, different in procedures, tolerances and surface. The procedures of sand casting are shell mold, pouring, after treatment and package. The tolerances are bigger than investment casting, and surface is more rough.

 

Item

Description
Product Name sand casting body part
Working Process Tooling make, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging
Material Stainless steel 304
Surface Treatment According to the requirement of customer
Application(Products cope) machine
Quality Control ISO9001, TS16949
Thickness Only to raw casting, more than 4mm
File Format Solidworks,Pro/Engineer,Auto CAD,PDF,JPG
Service 24-hour reply to customer's enquiry
Inspection IQC, IPQC,FQC,QA
Mould Depend on customer's require to make the mould.
Sample confirmation Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied.
Packing Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements

 

Payment & Shipping Terms:

Minimum Order Quantity: 400
Price: Quoted per see the drawing or sample
Delivery Time: 10-15 working days after received PO
Payment Terms: T/T, L/C
Supply Ability: 10,000pcs per month

 

FAQ:

Q: Who Are We?

1.We are a factory do the casting for more than 10 years.

2.Aroud more than 200 workers and 3000 square meter workshop

3.Customizing services, OEM services and good after services, etc.

 

Q: Where is your factory located? How can I visit there?

A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.

 

Q: What is the payment?

We prefer T/T, and also L/C if you want, the way of payment we can discuss.

 

Q: What is the lead time?

1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.

2. If do the mass production, the lead time will be with 20 working days after receiving the PO.

 

GOOD SERVICE:

We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.

 

LOWER PRICE:

The price of our products is reasonable and competitive, and we can discuss if you want.

&

Post Buying Request