user login

Custommade turbine valve part stainless steel casting parts lost wax

Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: Ottommo-stainless steel-030

Product Description

turbine valve part

Custom made turbine valve part stainless steel casting parts lost wax

 

Description

Material is stainless steel, for example, 304, 302, 316 and etc.

 

 

 

Item Description
Product Name stainless steel casting part
Working Process Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging
Material Stainless steel 304
Surface Treatment According to the requirement of customer
Application(Products cope) automobile turbo engine part
Quality Control ISO9001, TS16949
Thickness Only to raw casting, more than 4mm
File Format Solidworks,Pro/Engineer,Auto CAD,PDF,JPG
Service 24-hour reply to customer's enquiry
Inspection IQC, IPQC,FQC,QA
Mould Depend on customer's require to make the mould.
Sample confirmation Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied.
Packing Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements

 

Payment & Shipping Terms:

Minimum Order Quantity: 2000
Price: Quoted per see the drawing or sample
Delivery Time: 20 working days after received PO
Payment Terms: T/T, L/C
Supply Ability: 400,000pcs per month

 

FAQ:

Q: Who Are We?

1.We are a factory do the casting for more than 10 years.

2.Aroud more than 200 workers and 3000 square meter workshop

3.Customizing services, OEM services and good after services, etc.

 

Q: Where is your factory located? How can I visit there?

A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.

 

Q: What is the payment?

We prefer T/T, and also L/C if you want, the way of payment we can discuss.

 

Q: What is the lead time?

1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.

2. If do the mass production, the lead time will be 20-25 working days after receiving the PO.

 

GOOD SERVICE:

We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.

 

LOWER PRICE:

The price of our products is reasonable and competitive, and we can discuss if you want.

 

PERFECT QUALITY:

We have strict quality control from producing to deli

Post Buying Request