Place of Origin: | Zhejiang |
---|
Location: | Ningbo, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | Ottommo-polishing-016 |
---|
Description
The polish part is about surface treatment, which is composed of normal polish and mirror polish. Mirror polish is more difficult, and difficult on the casting. If there is broken on the surface of the casting, we can not do mirror polish. For if broken exsited, after mirror polish, the broken also exsited. After mirror polish, the part is more beautiful, whose color is like silver.
Item | Description |
Product Name | mirror polish part |
Material | Stainless steel 304 |
Surface Treatment | According to the requirement of customer |
Application(Products cope) | door shake or other civil use |
Quality Control | ISO9001, TS16949 |
Thickness | Only to raw casting, more than 4mm |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Service | 24-hour reply to customer's enquiry |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Sample confirmation | Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied. |
Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 |
Price: | Quoted per see the drawing or sample |
Delivery Time: | 20-30 working days after received PO |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,000pcs per month |
FAQ:
Q: Who Are We?
1.We are a factory do the casting for more than 10 years.
2.Aroud more than 200 workers and 3000 square meter workshop
3.Customizing services, OEM services and good after services, etc.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.
Q: What is the payment?
We prefer T/T, and also L/C if you want, the way of payment we can discuss.
Q: What is the lead time?
1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.
2. If do the mass production, the lead time will be 20-30 working days after receiving the PO.
GOOD SERVICE:
We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.
LOWER PRICE:
The price of our products is reasonable and competitive, and we can discuss if you want.
PERFECT QUALITY:
We have stri