user login

Low cost prefabricated light steel frame building warehouse

750.0 USD
Min. Order: 5 Ton
Trade Term: FOB,CFR,CIF
Payment Terms: L/C, T/T
Supply Ability: 3000ton
Place of Origin: Zhejiang

Company Profile

Location: Hangzhou, Zhejiang, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Means of Transport: Ocean, Air, Land
Brand Name: HANYU
Standard:: GB ISO
Place of Origin: Zhengjiang(Mainland)
Type: Light
Grade: Q235B,Q345B
Brand Name: HanYu
Application: Light steel factory
Dimensions:: Custom by customer
Model Number: Light steel structure
Surface finish: painting or hot-dip galvanized
Main structure:: H type column, Z type purlin, C type purlin
Production Capacity: 3000ton
Packing: Our packing always according to customer requirements
Delivery Date: In 60 days upon receipt of 40% deposit.
Show

Product Description

Low cost prefabricated light steel frame building warehouse


Description

Main steel
1steel beam columnQ235,Q345
Secondary steel
1Tie BarQ235
2PurlinC and Z purlin
3BracingQ235
Maintenance system
1Roof SheetCorrugated steel sheet, EPS sandwich panel, rockwool sandwich 
panel, PU sandwich panel
2Wall SheetCorrugated steel sheet, EPS sandwich panel, rockwool sandwich 
panel, PU sandwich panel
Accessories
1WindowAluminiumn Alloy, PVC, Sandwich Panel

2

DoorRoll up door, Sandwhich panel sliding door, personal door


Characteristics:

1. Enviromental friendly

2. Lower cost and maintenance

3. Long using time up to 50 years

4. Stable and earthquake resistance up to 9 grade

5. Fast construction, time saving and labor saving

6. Good appearance 


Used:

The steel workshop warehouse building is widely used for workshop plant, warehouse, office building, steel shed, aircraft hangar etc.


various light prefabricated steel structure warehouse

I can give you a quoted price if you offer this:

1. Dimension: Length, width, height etc.
2. Doors and windows: Dimension, quantity, position.
3. The material on the roof and the wall.
4. Local climate: Wind speed, snow load, seismic magnitude etc.
5. If you have other requirements, please also inform us.
6. It's better if you have your own drawings .Please send them to me.



Detailed Images


FACTORY SHOW


About our company

  Hanyu Steel Structure Group Co., Ltd with registered capital of 120 million yuan, mainly specializes in steel structure and deals in curtain wall, steel materials, international trade and cultural undertakings.
 Our company consists of two production bases in Hangzhou and Sichuan respectively, covering an overall area of 300 hectares, of which workshop area totals 80000 square meters. Boasting 6 space frame production lines, 4 truss structure lines, 7 light steel lines and 2 new-type foam concrete lines, our company is able to annually fabricate 200000 tons of steel structure, space frame and truss structure, and perform the project with construction area over one million square meter. Our company largely specializes in the diversified production of light steel structure, space frame structure, pipe truss structure, prefabricated houses, curtain walls, membrane structure and new-type foam concrete.  


Our company has obtained qualification and honor



Our projects:


Our services

Design & Engineering
1).Experienced and skilled team of designers including CAD designers and 3D designers has the capacity to deliver outstan-ding designs for your project.
2).Simple design service is free of charge to all clients to ensure customer.
If you require more complex engineering of structures such as load baring capacities we can also provide this service also designer fee.
3). We look forward to delivering exceptional designs and advice for your project.

Installation supervision and after-sales service

1).we have construction team.
2).If needed, we will dispatch our professional workers to conduct assembling guide or technical support for you on site.
3).We're at your service!


FAQ

1. Q: Order process?

  A: . Floor plan layout - Confirmation of building materials - Specific quotation - Place the order - Shop drawings - Manufacture - Shipping - Installation

2. Q: How to pay?

  A: T/T  - 30% deposit in advance,   70% balance before shippment. OR L/C At sight.   

3. Q: What is the delivery time?

  A: Generally speaking, the delivery time will be within 15 - 30 days.

4. Q: How to deliver?

  A: Delivered by 40ft GP / HQ / OT Shipping containers.

5. Q: How to install?

  A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send professional engineers to do the constructuion guidance, and some skilled workers to help installation. However, the visa fee, air tickets, accommodation, wages will be borne by buyers.




Post Buying Request