user login

Prefab light steel frame construction factory steel building warehouse

800.0 USD
Min. Order: 5 Ton
Trade Term: FOB,CFR,CIF
Payment Terms: L/C, T/T
Supply Ability: 3000ton
Place of Origin: Zhejiang

Company Profile

Location: Hangzhou, Zhejiang, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Means of Transport: Ocean, Air, Land
Brand Name: HANYU
Standard:: GB ISO
Place of Origin: Zhengjiang(Mainland)
Type: Light
Grade: Q235B,Q345B
Brand Name: HanYu
Application: Light steel workshop
Dimensions:: Custom by customer
Model Number: Light steel structure
Surface finish: painting or hot-dip galvanized
Main structure:: H type column, Z type purlin, C type purlin
Production Capacity: 3000ton
Packing: Our packing always according to customer requirements
Delivery Date: In 60 days upon receipt of 40% deposit.
Show

Product Description

Prefab light steel frame construction factory steel building warehouse


Detail Project Information                                                                                       

Summary

Project Name:

Prefab light steel structure factory steel building warehouse

/workshop

Structure Type:

Light Steel

Design Code:

GB

Wind load:

2(200kph)

Earthquake load:

4(Z=0.4)

Live load:

50kg/sq.m

Dust load:

10kg/sq.m

Temperature:

+/-30°C

Components

Steel Column:

Steel Q345, epoxy zinc primer with PU paint

Steel Beam:

Steel Q345, epoxy zinc primer with PU paint

Steel Support

Steel Q345, epoxy zinc primer with PU paint

High Strength Bolt:

Cr 40, electrogalvanizing

Purlin:

Steel Q345, galvanization

 

Our advantages

 

1) Integrated base and roof, PU injected, excellent strength and tightness

 

2) 0.426mm color steel sheet for sandwich wall panel, strong and beautiful

 

3) All electric wires, water pipes, windows, doors and floor pre-setted, easy for assembling

 

4) Long time oversea project experience

 

5)  4S sales and service network, buy a house just like to buy a car

 

6)  Qualification:  ISO9001

 

7) Durable, beautiful, economic and environmental

 

8) High Construction Efficiency (2 worker in one day for one unit)

 

9) Long life time (Max. 20 years)


FACTORY SHOW


About our company

  Hanyu Steel Structure Group Co., Ltd with registered capital of 120 million yuan, mainly specializes in steel structure and deals in curtain wall, steel materials, international trade and cultural undertakings.
 Our company consists of two production bases in Hangzhou and Sichuan respectively, covering an overall area of 300 hectares, of which workshop area totals 80000 square meters. Boasting 6 space frame production lines, 4 truss structure lines, 7 light steel lines and 2 new-type foam concrete lines, our company is able to annually fabricate 200000 tons of steel structure, space frame and truss structure, and perform the project with construction area over one million square meter. Our company largely specializes in the diversified production of light steel structure, space frame structure, pipe truss structure, prefabricated houses, curtain walls, membrane structure and new-type foam concrete.  


Marketing


Our company has obtained qualification and honor



Our projects:


Our services

Design & Engineering
1).Experienced and skilled team of designers including CAD designers and 3D designers has the capacity to deliver outstan-ding designs for your project.
2).Simple design service is free of charge to all clients to ensure customer.
If you require more complex engineering of structures such as load baring capacities we can also provide this service also designer fee.
3). We look forward to delivering exceptional designs and advice for your project.

Installation supervision and after-sales service

1).we have construction team.
2).If needed, we will dispatch our professional workers to conduct assembling guide or technical support for you on site.
3).We're at your service!


FAQ

1. Q: Order process?

  A: . Floor plan layout - Confirmation of building materials - Specific quotation - Place the order - Shop drawings - Manufacture - Shipping - Installation

2. Q: How to pay?

  A: T/T  - 30% deposit in advance,   70% balance before shippment. OR L/C At sight.   

3. Q: What is the delivery time?

  A: Generally speaking, the delivery time will be within 15 - 30 days.

4. Q: How to deliver?

  A: Delivered by 40ft GP / HQ / OT Shipping containers.

5. Q: How to install?

  A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send professional engineers to do the constructuion guidance, and some skilled workers to help installation. However, the visa fee, air tickets, accommodation, wages will be borne by buyers.




Post Buying Request