Min. Order: | 5 Ton |
---|---|
Trade Term: | FOB,CFR,CIF |
Payment Terms: | L/C, T/T |
Supply Ability: | 3000ton |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Means of Transport: | Ocean, Air, Land |
---|---|
Brand Name: | HANYU |
Standard:: | GB ISO |
Place of Origin: | Zhengjiang(Mainland) |
Type: | Light |
Grade: | Q235B,Q345B |
Brand Name: | HanYu |
Application: | Light steel workshop |
Dimensions:: | Custom by customer |
Model Number: | Light steel structure |
Surface finish: | painting or hot-dip galvanized |
Main structure:: | H type column, Z type purlin, C type purlin |
Production Capacity: | 3000ton |
Packing: | Our packing always according to customer requirements |
Delivery Date: | In 60 days upon receipt of 40% deposit. |
Prefab light steel frame construction factory steel building warehouse
Detail Project Information
Summary | Project Name: | Prefab light steel structure factory steel building warehouse /workshop |
Structure Type: | Light Steel | |
Design Code: | GB | |
Wind load: | 2(200kph) | |
Earthquake load: | 4(Z=0.4) | |
Live load: | 50kg/sq.m | |
Dust load: | 10kg/sq.m | |
Temperature: | +/-30°C | |
Components | Steel Column: | Steel Q345, epoxy zinc primer with PU paint |
Steel Beam: | Steel Q345, epoxy zinc primer with PU paint | |
Steel Support | Steel Q345, epoxy zinc primer with PU paint | |
High Strength Bolt: | Cr 40, electrogalvanizing | |
Purlin: | Steel Q345, galvanization |
Our advantages
1) Integrated base and roof, PU injected, excellent strength and tightness
2) 0.426mm color steel sheet for sandwich wall panel, strong and beautiful
3) All electric wires, water pipes, windows, doors and floor pre-setted, easy for assembling
4) Long time oversea project experience
5) 4S sales and service network, buy a house just like to buy a car
6) Qualification: ISO9001
7) Durable, beautiful, economic and environmental
8) High Construction Efficiency (2 worker in one day for one unit)
9) Long life time (Max. 20 years)
FACTORY SHOW
About our company
Hanyu Steel Structure Group Co., Ltd with registered capital of 120 million yuan, mainly specializes in steel structure and deals in curtain wall, steel materials, international trade and cultural undertakings.
Our company consists of two production bases in Hangzhou and Sichuan respectively, covering an overall area of 300 hectares, of which workshop area totals 80000 square meters. Boasting 6 space frame production lines, 4 truss structure lines, 7 light steel lines and 2 new-type foam concrete lines, our company is able to annually fabricate 200000 tons of steel structure, space frame and truss structure, and perform the project with construction area over one million square meter. Our company largely specializes in the diversified production of light steel structure, space frame structure, pipe truss structure, prefabricated houses, curtain walls, membrane structure and new-type foam concrete.
Marketing
Our company has obtained qualification and honor
Our projects:
Our services
Design & Engineering
1).Experienced and skilled team of designers including CAD designers and 3D designers has the capacity to deliver outstan-ding designs for your project.
2).Simple design service is free of charge to all clients to ensure customer.
If you require more complex engineering of structures such as load baring capacities we can also provide this service also designer fee.
3). We look forward to delivering exceptional designs and advice for your project.
Installation supervision and after-sales service
1).we have construction team.
2).If needed, we will dispatch our professional workers to conduct assembling guide or technical support for you on site.
3).We're at your service!
FAQ
1. Q: Order process?
A: . Floor plan layout - Confirmation of building materials - Specific quotation - Place the order - Shop drawings - Manufacture - Shipping - Installation
2. Q: How to pay?
A: T/T - 30% deposit in advance, 70% balance before shippment. OR L/C At sight.
3. Q: What is the delivery time?
A: Generally speaking, the delivery time will be within 15 - 30 days.
4. Q: How to deliver?
A: Delivered by 40ft GP / HQ / OT Shipping containers.
5. Q: How to install?
A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send professional engineers to do the constructuion guidance, and some skilled workers to help installation. However, the visa fee, air tickets, accommodation, wages will be borne by buyers.