user login

steel space frame gas station shed grid structure canopy

750.0 USD
Min. Order: 5 Ton
Trade Term: FOB,CFR,CIF
Payment Terms: L/C, T/T
Supply Ability: 3000
Place of Origin: Zhejiang

Company Profile

Location: Hangzhou, Zhejiang, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Means of Transport: Ocean, Air, Land
Brand Name: HANYU
Type: space frame
Certificate: ISO9001:2008
Grade: Q235 Q345
Standard: ISO9001
Material: steel
Usage: gas station
Feature: Easy to install and disassemble
Service duration: 50 Years
Production Capacity: 3000
Packing: Our packing always according to customer requirements
Delivery Date: In 60 days upon receipt of 40% deposit.
Show

Product Description

steel space frame gas station shed grid structure canopy

Specification 

 

Summary

Project Name:

Gas station structure

Structure type:

Bolted ball joint Space Frame

Shape:

Rectangle Shape

Dimension:

Length:600m, Wide:80m, Height:10m 

Wind load:

2(200kph)

Earthquake load:

4(Z=0.4)

Live load:

50kg/sq.m

Dust load:

10kg/sq.m

Temperature:

+/-30°C

Snow load:

None

Components

Bolt ball:

Steel #45, epoxy zinc primer with PU paint

Tube:

Steel Q235, epoxy zinc primer with PU paint

High strength bolt:

 40 Cr, galvanized

Sleeve:

Steel Q235, #45, galvanized

Purlin:

Steel Q235, galvanized C /Z section steel

Blanking plate/cone

Steel Q235, #45

Roof & Wall panel:

Sandwich panels, 0.5mm corrugated color steel sheet. 1.2mm FRP day-lighting panelation construction

Introduction
Steel space frame is an pre-engineered steel structure which is widely used for the large-scale workshop, or used for the warehouse, supermarkets, entertainment centers and other buildings. And the steel structure workshop is good at easy installation, stable structure, earthquake proofing, water proofing, energy conserving and environmental protection, etc


Feature 

  • Sturdiness

  • Light weight

  • Durable paintings

  • Weather proof

  • Corrosion resistant nature

  • Negligible maintenance require


Advantages:

1. Wide span: single span or multiple spans, the max span clear distance is 36m, without middle columns.
2. Low cost: unit price range from USD35 to USD70/square meter FOB according to customer's request.
3. Fast construction and easy in installation
4. Long term service life: more than 50 years.
5. Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving.


FACTORY SHOW


About our company

  Hanyu Steel Structure Group Co., Ltd with registered capital of 120 million yuan, mainly specializes in steel structure and deals in curtain wall, steel materials, international trade and cultural undertakings.
 Our company consists of two production bases in Hangzhou and Sichuan respectively, covering an overall area of 300 hectares, of which workshop area totals 80000 square meters. Boasting 6 space frame production lines, 4 truss structure lines, 7 light steel lines and 2 new-type foam concrete lines, our company is able to annually fabricate 200000 tons of steel structure, space frame and truss structure, and perform the project with construction area over one million square meter. Our company largely specializes in the diversified production of light steel structure, space frame structure, pipe truss structure, prefabricated houses, curtain walls, membrane structure and new-type foam concrete.  


Marketing


Our company has obtained qualification and honor



Our projects:


Our services

Design & Engineering
1).Experienced and skilled team of designers including CAD designers and 3D designers has the capacity to deliver outstan-ding designs for your project.
2).Simple design service is free of charge to all clients to ensure customer.
If you require more complex engineering of structures such as load baring capacities we can also provide this service also designer fee.
3). We look forward to delivering exceptional designs and advice for your project.

Installation supervision and after-sales service

1).we have construction team.
2).If needed, we will dispatch our professional workers to conduct assembling guide or technical support for you on site.
3).We're at your service!


FAQ

1. Q: Order process?

  A: . Floor plan layout - Confirmation of building materials - Specific quotation - Place the order - Shop drawings - Manufacture - Shipping - Installation

2. Q: How to pay?

  A: T/T  - 30% deposit in advance,   70% balance before shippment. OR L/C At sight.   

3. Q: What is the delivery time?

  A: Generally speaking, the delivery time will be within 15 - 30 days.

4. Q: How to deliver?

  A: Delivered by 40ft GP / HQ / OT Shipping containers.

5. Q: How to install?

  A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send professional engineers to do the constructuion guidance, and some skilled workers to help installation. However, the visa fee, air tickets, accommodation, wages will be borne by buyers.



Post Buying Request