user login

ID 6-160 mm EPDM Foam Machine Air Conditioner Insulation Hose Production

Place of Origin: Zhejiang

Company Profile

Location: Qingdao, Shandong, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: XSF-900, 1200, 1500

Product Description

ID 6-160 mm EPDM Foam Machine Air Conditioner Insulation Hose Production

 

 

Materials:

EPDM (Ethylene-Propylene-Diene Monomer) and other accessory materials.

 

Production process:

Mixing materials - extrusion - curing and foam - cutting

 

Main composition:

Internal mixer (kneader), open mixer, extruder, foam oven, printing system, cutter,etc.

 

Application:

This kind of pipe can be widely used in domestic air-conditioner, central air-conditioner, commercial air-conditioner, etc..

 

Service:

We provide turnkey services, including installation, commissioning, formula (recipe), technology and training.

 

Questions and answer:

Q: what products can we get from this production line?

A: EPDM foam pipe and sheet in different sizes, colors and density.

Q: What sizes can the production line produce?

A: inner diameter 6-160mm, wall thickness 6-40mm

Within this range, we can provide any models to satisfy you.

Q: how many lines/strands of pipes can be produce?

A: our machine can produce 1-12 pipes per time.

Q: Do you provide formula (recipe) and technology?

A: We provide formula and technology. We can adjust the formula to meet requirements of customer and local market.

Q: how can we get the materials?

A: we will provide specification, brands and suppliers of materials. Or we can directly provide mixed materials. Or we can help customer to buy them.

Q: What about installation, commissioning and training?

A: After we get notice from customer, we will send worker and technician to customer’s factory to install machinery, run the production line and do trial production, meanwhile, train worker and technician to operate the machinery and master the formula and technology.

Q: Is there guarantee period for the machinery?

A: guarantee period: 12 months. It begins from successful installation and commissioning in customer’s factory.

Q: how long will the machinery be finished?

A: It will be finished within 60-120 days according to the machine size.

Q: how many workers are needed to operate the production line?

A: 6-10.

Q: what kind of energy will the machinery use?

A: natural gas or electricity. It depends on customer’s condition.

Q: what kind of package will be used when delivery?

A: water-proof plastic film and sandwich plate.

Q: how many final products can the machinery produce?

A: generally 1-10 tons.

Q: if there is breakdown, how can we do?

A: we provide spare parts for the production line. If the problems cannot be solved by customer, we can send engineer or technician to customer’s factory at the fastest speed.

Q: what about the service life of production line?

A: We have been manufacturing this machinery for nearly 20 years. Till now, there is no big problem. All the machines normally run.

Q: which grade can your machinery produce?

A: Class 0, Class1, Class B1, Class B2. Any class and grade.

Q: what about the density of final products?

A: 45-65kg/m3.

Q: what kind service will you provide?

A: pre-sale investment planning, sale support, after sale services and long term technical support.

Q: Will you do trial production in your factory?

A: We will do trial production in our company. After get customer’s acceptance, the machinery just can be delivered.

Post Buying Request