Min. Order: | 1 Piece/Pieces |
---|---|
Payment Terms: | L/C, D/P, T/T |
Supply Ability: | 500 Ton/Tons per Day |
Place of Origin: | Hunan |
Location: | Changsha, Hunan, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Production Capacity: | 500 Ton/Tons per Day |
---|---|
Packing: | as to buyer's requirements |
Delivery Date: | 10-30 days |
FOB Price:US $ 1 - 50 / Piece
Min.Order Quantity:1 Piece/Pieces
Supply Ability:100 Ton/Tons per Day
Port:Tianjin Port
Place of Origin: China (Mainland)
Brand Name: World
Product type: thickness of scaffolding pipe
Lifespan: 5-7 years
Technology: auto welding
Production lead time: 10-30 days
Business type: manufacturer
Packing: in bulk, in bundle, in pallet
WORLD SCAFFOLDING which is one of the largest Scaffolding R&D, manufacturing and trading group company in China, our products follow SGS, TUV, EN39, EN71, we are able to best serve our customers by providing a one-stop shopping & service company, scaffolding system, frame systems, galvanized steel tube, steel prop and the accessories are all available in our group.
48.3mm Galvanized Steel Scaffolding Pipes are designed for pipes&coupler scaffolding.The pipes have hot-dipped galvanized surfaces finish so as to provide excellent appearance with sufficient durability in such applications where salty air or long-term weather exposures are inevitable.
Standard Size
galvanized scaffolding pipe | galvanized scaffolding pipe | galvanized scaffolding pipe |
48.3-48.6 | 2.0-2.5 | 0.3-12 |
48.3-48.6 | 2.75 | 0.3-12 |
48.3-48.6 | 3.0 | 0.3-12 |
48.3-48.6 | 3.25 | 0.3-12 |
48.3-48.6 | 3.5 | 0.3-12 |
48.3-48.6 | 3.75 | 0.3-12 |
48.3-48.6 | 4.0 | 0.3-12 |
BS1139 STANDARD GALVANIZED SCAFFOLDING TUBE/PIPE PRICE | ||
1. Material | Steel Grade | Q195, Q235, Q345 etc. |
2. Size | W.T | 2.0mm-4mm |
Diameter | 48.3mm~60.3mm | |
Length | 5.8m-14m,could be customised | |
3.Zinc Coating | 200~600g/m2, could be thicker or thinner if you need | |
4. Certification | BV, IAF, SGS,COC, ISO etc. | |
5.Packing | Packing in bundle with steel stripsor as your request | |
6.Delivery Time | Usually 15-25 days after receipt of deposit, ASAP | |
7.Payment Terms | T/T, L/C etc. | |
8.Trade Terms | FOB, CFR, CIF etc. |