1. Professional and Strong Manufacture and Sells Team:
Team of GEM YOUNG service |
Name | education | Position | Mainly responsible for project | Specializing in project | Industry working history ( year ) |
zanyang Xie | college | General Engineer | The total project design and planning | power cable machine | 15 |
xioahua Hu | college | Vis general engineer | The total project design and planning | net cable,data cable machine | 10 |
Chnaghong Cheng | college | Engineer | Drawings and after-sales service | Teflon,Optical fiber cable machine | 25 |
xiuwu Chen | college | General Engineer | The total project design and planning | copper drawing machine | 15 |
lixin Yuan | college | Engineer | The project design and planning | coppwer wire making technical | 16 |
zhenghai Qiu | college | cable engineer | After service | cable making and cable factory management servie | 15 |
jinxin Liu | college | Marketing engineer | After service | electrical engineer | 7 |
xingguo Tang | High school | Electrical engineer | After service | electrical engineer | 10 |
changqiang Li | High school | Maintain engineer | After service | machina maintain and install service | 10 |
haipin Li | University | Engineering director | Marketing and sales | project consulting | 8 |
sen Yang | University | Engineering translator | Marketing and sales | project consulting | 5 |
-Factory and office:
2.GEM Spare Parts Brands:
Motor: Dongguan Motor , Teco, ABB, Siemens
Inverter : Japan Yaskawa, Siemens, Taiwan Teco
Temperature Control Meter: Japan RKC;
Auxiliary Relay: Japan Omron ;
Ammeter and Voltmeter: Taiwan Risesun ;
Indicator, Switch and Button: Taiwan TEND ;
Contactor: Taiwan Shihlin
Line Speed Meter: Taiwan FOTEK/Yangming
Bearing : NSK, SKF
Certification:
3.Technique Specifications:
Line data:
- Process material: PVC/XLPE
- Process solution: single layer/ color stripping
- Conductor section: 0.75mm2to 10mm2 (single core)
Or up to 4 X 6 mm2multi core cable
- Insulation thickness: 0.5mm---1.5mm
- Size after insulation: 1.5mm---15mm
- Linear speed: Max. 450m/min (based on the cable diameter)
- Line axis height: 1000mm
- Machine color: Based on customer's requirement
- Machine direction: Based on customer's requirement
- Power: 3P/ 380V / 50Hz
- Total line length: about 30 m
Customer visit:
Consisting Components:
1,double-shaft pay-off rack
2,straightener platform
3,main extruder
4,automatic dryer and hopper
5,electric apparatus main control cabinet
6,Double layer movable trough
7,laser diameter gauge or Digital Diameter controller
8,high speed printing machine
9,double-wheels capstan
10,Meter counter
11,horizontal type wire-accumulator
12,power frequency sparker
13,double-shaft take-up machine
GEM Performance table |
Item | Conductor section | Insalution thickness | Cable diameter | Production speed |
Unite | mm2 | mm | mm | m/min | km/hr |
1 | 0.75 | 0.6 | 2.3 | 450 | 27 |
2 | 1 | 0.6 | 2.5 | 450 | 27 |
3 | 1.5 | 0.6 | 2.8 | 450 | 27 |
4 | 2.5 | 0.7 | 3.2 | 450 | 27 |
5 | 4 | 0.8 | 3.9 | 370 | 22 |
6 | 6 | 0.8 | 4.4 | 320 | 19 |
7 | 10 | 1 | 5.7 | 250 | 15 |
8 | 2 X 1.5 | 1.2 | 7.6 | 130 | 7.8 |
9 | 3 X 2.5 | 1.2 | 9.2 | 110 | 6.6 |
10 | 4 X 4 | 1.2 | 11.5 | 90 | 5.4 |
11 | 4 X 6 | 1.2 | 12.5 | 80 | 4.8 |
International fair:
Optional:
1.Different take-up machine etc.
2.Flyer pay-off or other pay off machine.
3.Taiwan or Swiss brand crosshead.
4.Copper pre-heater.
5.Talc applicator.
6.Different brand Laser diameter gauge.
7.Coiler on line
-Delivery
4.Afetr service
1).Delivery dates: 45 days
2).Payment: TT or L/C
3).Packing: Wood packing and PE plastic packing ensure the goods safety on the transportation.
4). Install and training service: 2 professional engineers who has over 5 years overseas install and cable manufacture training experience.
5) after service phone number online
5.Contact information:
Add:No. Beice District, Humen Town,
Dongguan City, Guangdong Province,China
6.Where are we:
Hongkong airport to Humen by boat 2 hours
Guangzhou airport to Humen by car 2 hours
Shenzhen airport to Humen by car 1 hour
Guangzhou South high speed train station to Humen 20 minutes
Shenzhen North high speed train station to Humen 20 minutes