user login

5 - 40mm Old Material Diameter Asphalt Recycling Plant With 500t / H High Toughness Rubber Belt

Place of Origin: Zhejiang

Company Profile

Location: Wuxi, Jiangsu, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: ZSLQ

Product Description

5-40mm old material diameter asphalt recycling plant with 500t/h high toughness rubber belt

 

1, Pretreatment of reclaimed asphalt mixture:

Natural environment will affect the asphalt mixture road and roller compaction of vehicle will destroy the road, and the asphalt content and material quality can’t be controlled, so the factory should check the characteristic reclaimed asphalt mixture before use to control the mixture quality.

 

2, Heating ,weighing and mixing process for asphalt regenerate mixing

Regenerate asphalt mixture will be heated in the special dryer. In order to avoid old material coked during heating process and affect the physical features, so indirect heating method (heat blower) is adopted. This is a good way to avoid flame burning and coking old material and affecting physical features.

 

3,  Regenerate asphalt mixture will be put into a storage bin with heat preservation after heating. According to compound material , Electronic scale will meter material automatically, accuracy:±2.5%(dynamic).Old material temperature can be controlled between 80150; control accuracy ±5.

Mix evenly hot metering regenerate asphalt mixture and new material in the mixer.

 

Conclusion :Regenerate asphalt plant achieves the auto and manual operation. This equipment can be modified in the basis of original equipment which can reduce capital and increase production efficiency.

Asphalt hot Regeneration Mixing Plant

 

 

Item:ZSLQ-1000 model recycled asphalt mixing plant

Usage:Suit to 2000 model(120~160t/h) asphalt mixing plant, used for recycling waste road asphalt materials

Power source:380V/50Hz.

Scope of supply:

No. Name Quantity Remark
A Feeding System Of Cold Aggregate
1 Cold Aggregate Ground Hopper (with wall vibrator) 2 sets Combined together, empty hopper alarm device
2 Strap Feeder 2 sets frequency converter
3 Collective Belt Conveyer 1 set  
B Cold Aggregate elevator
1 Stone Material Hoist 1set  
C Cold Aggregate dryer
1 Drying drum(Friction Driven) 1set Stainless steel cover
2 burner 1set Italy Ebico
3 Hot air generator 1set  
D Storage and weighing system
1 4.5 ton storage silo (equipped weight sensor,indicator ) 1set  
2 Weighing bin 1 set  
2 Hot material conveyor 1 set  
E Dust Collector
1 Draught Fan 1 set Electrical air door
2 Smoke Path and Chimney 1 set  
F Main Frame Part System
Post Buying Request