Product Description
Full Automatic High Speed Frequency Under Pad MachineMachine ShowUnderpad Show:Product DescriptionTechnical Parameter:1.Power: Triphase 380V, 50Hz.2.Total Power: 150KW3.Dimension(L x W x H):16000mm x 6000mm x 5000mm.4.Design speed: 100meter/min.5.Rate of finished products: ≥ 98%6.Efficiency range:85%(remark:15% working time,machine stops because change of raw materials, change the different of products size.)7.Underpad weight tolerance:+-3%8.Air pressure:0.6-0.8mpa9.Packing:Antirust Oil& PE Film Cover & Seaworthy Wooden Box.Equipment Characteristic:※ Reasonable structure and refined parts make it reliable when being used and the assemblage function makes the transportation and installation much easier. ※ Controlled under the heavy-current or industry computer, it is easier to operate and adjust.※ During the process of operation, the quantity of velvet laid for the core can be under non-step adjustmet and the combine roller can be used to ensure appropriate thickness of the core. Besides, wastes of fluff pup can also be recycled and re-feeding.※ All the products are fully embossed, making them bright and good-looking.※ Machine can produce products of differnet sizes. Release paper can be added to the back sheet as optional.※ Tissue paper, air-laid paper& fluff pulp can be used to produce under pads.※ SAP can be supplied at a fixed amount in designed locations or in a fixed position.※ Simple driving system, reliable working, convenient maintenance; all control is realized through software, easy for function adjustting, technical upgrade.Other Devices for choosing:a.Hot Melt Machineb.Soundproof room for mill and fan.c.Air filter dust collectord.Low noise pipe systemProducts details showMachine product flowchatPacking DetailsPacking: Antirust oil & PE Wrapping Film & Seaworthy wooden boxOther quickly details.a .Machine warranty:12monthsb.Worker training: Buyer can send people to Yichuan factory to learn the machine before delivered. Yichuan will free offer accommodation and diet.c.Installment time: 15-30daysd.Installed engineer salary: $80/Person/Day will be charged for technician.buyer will offer the charge of ticket,passport,accommodation & diet.f Materials provide: Seller can offer all raw materials which the production required.g Operator: 3 people.