user login

Two head bottle filler

Place of Origin: Shandong

Company Profile

Location: Jinan, Shandong, China (Mainland)
Business Type: Manufacturer

Product Description

Technology parameter

Filling heads

2

Filling   capacity

100-300BPH(according to operation proficiency)

Filling method

Isobaric   manual filling

Beer connector   diameter

DN20

CO2 connector   diameter

∮8

Outsize

550mm*550mm*1350mm(L*W*H)

 

Equipment installation and commissioning

1.Firstly install the beer filler on the filling site. It is better to be closer to the draft beer buffer tank.

2.Adjust the four footing screws of the filler until it does not shake and be steady. 

3.Connect beer inlet pipe. The filler beer inlet pipe mouth is DN20 flexible pipe connector, the same as buffer tank beer outlet pipe mouth. This two pipe mouth can be connected by pressure hose (the internal diameter of the flexible pipe is 62.5px). After insert the flexible pipe, tighten it by steel wire clamp.


Post Buying Request