Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | Paypal, L/C, D/P, D/A, T/T, WU, Money Gram |
Place of Origin: | Henan |
Location: | Zhengzhou, Henan, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | HS-L-01 |
---|---|
Means of Transport: | Ocean, Land |
Brand Name: | Dashan |
Packing: | Standard export wooden box package |
Delivery Date: | within 7days after payment received |
Origin: Henan, China (Mainland)
Brand: Dashan
Model Number: HS-L-01
Type: Bushings
Machine Type: Crusher
Certification: ISO9001
Material: Bronze
Processing Type: Casting
Use: Ore Mining
Characteristic: Durable and stable
Weight: Based on the model
Processing type:Centrifugal casting
Price: FOB
QC control: 100% inspected by us, also accepts third part inspection
Lubricant: Oiling
Drawing: Yes
Spring crusher :600.900,1200,1750,2200
Symons crusher:2ft ,3ft ,4 4/1ft 51/2ft 7ft ,10ft
Metso crusher :HP100, HP200, HP300, HP400, HP500 ,HP700, HP800
GP100, GP110, GP300 , GP500
C80, C100, C110, C125, C140, C160, C200
The role of cone crusher spare parts are as slide bearings It has an irreplaceable role in the cone crusher. So, what is the specific role of the copper sleeve that makes something that requires attention?
Role cone crusher spare parts
Cone Crusher middle of a large gear assembly is cone crusher spare part, moving cone axis interpolation, the smaller gap of about 3 mm, under a larger gap of about 8 mm, can be measured with a thick fuse assembly, socket liner abrasion and wear of moving cone sphere will affect the gap, moving cone trajectory by decision.
Removing cone crusher spare parts
Outer copper bushing can be pulled by homemade device removed after the demolition of the need to check the size of the hole in the creel. Copper rod inside sleeve can center or disk device by using a hammer split out, after the demolition of the need to check the size of the hole in the creel.
Installing cone crusher spare parts
When installing the countershaft bushing, use dry ice shrink at least two hours. After installation is completed, you need to install the top screws, screw fastening needs painted with a professional plastic.