Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 0-200sets per year |
Place of Origin: | Jiangsu |
Location: | Suzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | kpm |
---|---|
Means of Transport: | Ocean |
Brand Name: | BENK |
pipe range: | 20-110mm |
material: | PVC |
pipe functiom: | water supply |
extruder: | SJZ65/132 conical double screw |
capacity: | MAX 200KG/H |
Inverter: | ABB |
Main motor: | SIEMENS AC motor |
installation power: | 83Kw |
instalaltion area: | 24X2X2.6m |
color: | aaccording to your requirements |
Production Capacity: | 0-200sets per year |
Packing: | suitable sea transport package |
Delivery Date: | 50 working days after deposit money received |
BENK Machinery 20-110mm PVC conduit pipe production line manufacture
BENK Machinery 20-110mm PVC conduit pipe production line supplier
Description of pipe production line
PVC pipe extrusion machines mainly used in the manufacture of the UPVC and PVC pipes with various tube diameters and wall thickness such as the agricultural and constructional plumbing, water supply and drain etc.
This set is composed of conical twin-screw extrude, vacuum calibration tank, haul-off machine, cutter, stacker etc. The screw extruder and traction machine adopt imported AC frequency control device. The vacuum pump and traction motor both adopt advanced products. The haul-off machine has many models, such as two-claw, three-claw, four-claw, six-claw etc. It may choose visual blade or cutting type.The unit is of reliable performance and high production efficiency.
Our machine can produce the PVC pipe with diameter from 16mm to 630mm
Main Technical Parameters of pipe production line | ||||||
Model | PVCG-110 | PVCG-160 | PVCG-250 | PVCG-315 | PVCG-400 | PVCG-630 |
Matched extreder | SJSZ51/105 | SJSZ65/132 | SJSZ65/132 | SJSZ80/156 | SJSZ80/156 | SJSZ92/188 |
OD Range(mm) | 20-110 | 50-160 | 75-250 | 110-315 | 200-400 | 315-630 |
Length of vacuum calibration tank(mm) | 6000 | 6000 | 6000 | 6000 | 6000 | 6000 |
Haul speed(m/min) | 0.6-6 | 0.5-5 | 0.4-4 | 0.3-3 | 0.2-2.5 | 0.2-1.5 |
Installed power(kw) | 67 | 85 | 95 | 125 | 135 | 255 |
Total length(mm) | 17000 | 18000 | 20000 | 20500 | 28000 | 30000 |
more reference pictures of pipe production line:
extruder
mould;
vacuum forming tank:
haul-off:
planetary cutter:
2. pvc pipe manufcturing processing manufacture after-sales service
2.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
2.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of lading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.