Min. Order: | 1 Set/Sets |
---|---|
Payment Terms: | L/C, T/T |
Supply Ability: | 0-200sets per year |
Place of Origin: | Jiangsu |
Location: | Suzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | kpm |
---|---|
Means of Transport: | Ocean |
Brand Name: | BENK |
model: | KPM-SRL-Z500/1000 |
capacity: | 120-400KG |
mixing time each times: | 8-10min |
total volume: | hot 500L cool 1000L |
effective volume: | hot 325L cool 650L |
hot mixing motor: | 75KW SIEMEN motor |
speed control: | 75KW ABB inverter |
cool mixing motor: | 15KW |
color: | according to your idea |
certificate: | CE ISO9001 |
Production Capacity: | 0-200sets per year |
Packing: | suitable sea transport package |
Delivery Date: | 50 working days after deposit money received |
BENK Machinery China PVC compounding machine manufacture
BENK Machinery China plastic granules mixer supplier
The uint combines heat mixing and cool mixing craft together.the materials after heat mixing can be got into cool mixer for cooling automatically, prevent agglomeration.
function and introduciton:
1.It is used in mixing, drying, coloring and other processing. It is the most ideal equipment for producing shaped plastic material and plastic.
2.The technology of the main shaft sealed apparatus with electric and steam heating functions.
3.Two layer of sealing technology is adopted in the pot cover. The opening of the heating mixed cover adopted the air opening device and the opening of the cooling mixed cover adopted hydraulic pressure control system.
4.The electrical control section with the programmable logic control adopted well-known imported meters and control components.
5.It is equipped with the pulse dust-cleaning recovery device.
6. The blades have been passed the test of the dynamic and static balance testing machine
7.You may choose the simple and easy feeding system.
advantage:
1. Special equipment for plastic material
2. With PLC control
3. Automatic mixing
4. CE&ISO9001
5. High peed
6. ABB inverter
Main Technical Parameter:
Model/specs | SRL-Z100/200 Hot mixing/cold mixing | SRL-Z200/500 Hot mixing/cold mixing | SRL-Z300/600 Hot mixing/cold mixing | SRL-Z500/1000 Hot mixing/cold mixing | SRL-Z800/1600 Hot mixing/cold mixing |
Total cubage(L) | 100/200 | 200/500 | 300/600 | 500/1000 | 800/1600 |
Effective cubbage(L) | 65/130 | 150/320 | 225/380 | 375/650 | 600/1050 |
Mixed speed(r/min) | 650/1300/80 | 475/950/80 | 475/950/80 | 430/860/60 | 370/740/50 |
Heating & cooling manner | electric heating self-friction/water cooling | ||||
Mixed time(min/batch) | 8-12 | 8-12 | 8-12 | 8-12 | 8-12 |
Motor Power(KW) | 14/22/7.5 | 30/42/11 | 40/55/11 | 47/67/15 | 60/90/22 |
Dimension(L×W×H)(mm) | 1950×1600×1800 | 4580×2240×2470 | 4800×2640×2480 | 4600×3000×4050 | 5170×3200×4480 |
Weight(kg) | 2200 | 3400 | 3600 | 4800 | 6200 |
more pictures:
hot-cool mixer
mxing blade
mixing tank wall stainless steel
FAQ:
Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machine when shiped.
During the warranty time, we will supply the spare parts with our cost including the delivery fees
Q: How to install my machines when it arrives? how much the cost?
A: We will send engineers to your factory to install the machines and train your staff how to operate the mahcines.
Customer pay airtickets go and back, accommodation and USD80/day/Engineer.
Q: When can I get m machine after paid?
A: Usually it cost about 30-60 days, the exactly depend on what kind of machine you order. the shipping time is based on your destination port.
Q: What is your guarantee or warranty of the quality if we order your machines?
A: We offer high quality machines with 13 month guarantee since B/L issued, and supply life-long technical support.
Q: Are you a trading company or manufacture?
A: We are a manufacture, we supply the factory price with high quality, welcome to visit!
3, BENK's Service:
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of loading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.