user login

BENK Machinery China PVC heating cooling mixer manufacture

18000.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 0-200sets per year
Place of Origin: Jiangsu

Company Profile

Location: Suzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Model No.: kpm
Means of Transport: Ocean
Brand Name: BENK
model: KPM-SRL-Z500/1000
capacity: 120-400KG
mixing time each times: 8-10min
total volume: hot 500L cool 1000L
effective volume: hot 325L cool 650L
hot mixing motor: 75KW SIEMEN motor
speed control: 75KW ABB inverter
cool mixing motor: 15KW
color: according to your idea
certificate: CE ISO9001
Production Capacity: 0-200sets per year
Packing: suitable sea transport package
Delivery Date: 50 working days after deposit money received
Show

Product Description

BENK Machinery China PVC heating cooling mixer manufacture

BENK machinery China plastic raw material mixer supplier


pvc heating cooling mixer is widely used to compound PVC resin with some other materials in the industry of PVC extrusion, PVC pelletizing/granulating and so on. 

It composed mainly by hot mixer and cooling mixer. the hot mixer will heat the material to 110C, at this temperature, the additives will be mixed fully and re-act each other which is necessary for extrusion stage, the cooling mixer will cool down the mixture to 45C to avoid material decomposition. 


technical paramters for normal models

ModelSRL-Z100/200SRL-Z200/500SRL-Z300/600SRL-Z500/1000
Total capicity(L)100/200200/500300/600500/1000
Mixing capicity(kg/h)165325500750
MOtor power(kw)14/22/7.530/42/1140/50/1547/67/15
Paddle speed(r/min)650/130/180475/950/130475/950/130430/860/60

technical paramter more big capacity mixers;

SRL-Z800/1600SRL-Z800/2500SRL-Z1000/3000SRL-Z1300/4500
800/1600800/25001000/30001300/4500
1400140019002500
60/90/18.580/110/30110/160/37132/200/45
370/740/50370/740/50325/650/50250/500/50


more pictures of plastic mixer:

mixer


mxing tank wall made by 6mm stainless steel, hollow used for cooling water


mxing blade


material discharge by penumatic:



FAQ:

Q: How about the spare parts?

A: We will send one year enough easy broken spare parts together with the machine when shiped.

  During the warranty time, we will supply the spare parts with our cost including the delivery fees
 

Q: How to install my machines when it arrives? how much the cost?

A: We will send engineers to your factory to install the machines and train your staff how to operate the mahcines.

    Customer pay airtickets go and back, accommodation and USD80/day/Engineer.
 

Q: When can I get m machine after paid?

A: Usually it cost about 30-60 days, the exactly depend on what kind of machine you order. the shipping time is based on your destination port.
 

Q: What is your guarantee or warranty of the quality if we order your machines?

A: We offer high quality machines with 13 month guarantee since B/L issued, and supply life-long technical support.
 

Q: Are you a trading company or manufacture?

A: We are a manufacture, we supply the factory price with high quality, welcome   to visit!



3, BENK's Service:

3.1 Technical documents

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.

 

3.2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc. 

b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.  

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer's factory.

e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.

 

3.3. Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

b. Guarantee period and after-sales services: 13 months since date of bill of loading

During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price. 

c. Long-term service:

BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.


We thank you for your inquiry and would be pleased to receive your order soon.

 

ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.


Post Buying Request