Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 0-200sets per year |
Place of Origin: | Jiangsu |
Location: | Suzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | KPM-SHR-800 |
---|---|
Means of Transport: | Ocean |
Brand Name: | BENK |
model: | KPM-SHR-800 |
capacity: | 500-600KG |
mixing time each times: | 8-10min |
total volume: | 800L |
effective volume: | 625L |
hot mixing motor: | 110KW SIEMEN motor |
speed control: | 110KW ABB inverter |
suitable material: | WPC/PVC/ABS/ etc. |
color: | according to your idea |
certificate: | CE ISO9001 |
Production Capacity: | 0-200sets per year |
Packing: | suitable sea transport package |
Delivery Date: | 35 working days after deposit money received |
SHR800 high speed plastic mixer machine
SHR800 high speed mixing machine
1.INTRODUCTION
SHR Series high speed mixers are used in mixing ,stirring ,drying ,coloring materials in plastics, rubber , and chemical industries.
SHR Series high speed mixers adopt advanced design, so it is convenient and safe for operation. It offers samll size, light weight,high efficiency.
2.MAIN TECHNICAL PARAMETER
Model | Total Volume(L) | Effective Volume(L) | Motor Power(kw) | Main Shaft Speed(r/min) | HeatingWay | UnloadWay |
SHR-10A | 10 | 7 | 2.2/3.2 | 750/1500 | Self-friction | Manual |
SHR-50A | 50 | 30 | 7/11 | 750/1500(510/1013) | 4kw | Pneumatic |
SHR-100A | 100 | 75 | 14/22 | 525/1050(650/1300) | 6KW | Pneumatic |
SHR-200A | 200 | 150 | 30/42 | 490/980 | 6KW | Pneumatic |
SHR-300A | 300 | 225 | 40/55 | 480/964 | 9KW | Pneumatic |
SHR-500A | 500 | 375 | 47/67 | 441/886 | 9KW | Pneumatic |
SHR-800A | 800 | 560 | 83/110 | 330/660 | Self-friction | Pneumatic |
reference pictures:
SHR800 model:
SHR200 model:
SHR200+SHR300+SHR500 model together:
3, BENK's Service:
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of loading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.