Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 100SETS /YEAR |
Place of Origin: | Jiangsu |
Location: | Suzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | KPM-W300 |
---|---|
Means of Transport: | Ocean |
Brand Name: | BENK |
recycling raw material: | Pe/PP bottle |
washing capacity: | 100-1000KG |
instalaltion power: | 50-200KW |
motor: | SIEMENS |
INVERTER: | ABB |
voltage: | 380V or according to you locally voltage |
color: | according to your idea |
certificate: | CE ISO9001 |
installation size: | 34*4*4M |
condition: | new |
Production Capacity: | 100SETS /YEAR |
Packing: | suitable sea transport package |
Delivery Date: | 50 working days after deposit money received |
PE/PP bottle washing line
PE/PP bottle recycling line washing machine
machine description:
PE, PP Washing Line is also called PE, PP crushing, washing, dewatering and drying line.
We can supply production line with capacity from 100kg/h to 1000kg/h.
We can design different pp/pe recycling line for you according to your request:
1: There are different capacity can be supplied: 200-300kg/h, 500-800kg/h, 800-1000g/h.
2: You can choose different devices according to your material.
3: According to your country condition, you can choose full automatic line or semi-automatic line.
4: You can purchase separate device based on your own conditions.
5: We providing turn-key project for you. Design-product-installment-testing.
reference pics:
whole line:
convey belt + crusher + hot washer
high speed friction washer:
floating washer:
Dewatering machine
pipe drying system + silo
machine list & main technical parameters:
Name | (KW) Motor power | (mm) dimension | (T/H) Water consumption | (mm) Stainless steel standard | Electric standard |
Belt conveyor | 1.5KW | 4000*600*2100mm | - | - | According to customer's standard |
Crusher | 37KW | 1800*1500*3000mm | 0.6-1.0 | - | |
Screw charger | 1.5KW | 3300*420*1600mm | - | 3-5 | |
Floating washing tank | 2.2*2KW | 6000*1250*1700mm | 4-5 | 3-5 | |
High speed friction washing machine | 22KW | 3200*1200*1800mm | 1-2 | 3-5 | |
Screw charger | 1.5KW | 3000*420*1460mm | - | 3-5 | |
Dewatering machine | 45KW | 1750*1420*1770mm | - | 5 | |
Storage for transition | - | 1200*1000*3000mm | - | - | |
Drying system | 28KW | 3700*1000*2000mm | - | 3-5 | |
Storage hopper | 2.2KW | 3700*1500*3500mm | - | - | |
Electric cabinet | - | 2000*450*1780mm | - | - |
3, BENK's Service:
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of loading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.