Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 100SETS /YEAR |
Place of Origin: | Jiangsu |
Location: | Suzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | KPM-SGK250, kpm-sgk400, kpm-sgk630 |
---|---|
Means of Transport: | Ocean |
Use: | Others |
Plastic Type: | PVC |
Shaft Design: | Others |
Brand Name: | BENK |
Power: | 37kw |
pipe range: | 20-630mm |
beling style: | R & U style |
automatic degree: | whole autoamtic |
machine color: | according to your requrement |
working length: | 4-6mm |
working speed: | 2-40pcs/H |
heating power: | 8KW |
MAX temperature: | 280 |
total power: | 37KW |
weight: | 2500KG |
Production Capacity: | 100SETS /YEAR |
Packing: | suitable sea transport package |
Delivery Date: | 50 working days after deposit money received |
automatic pvc pipe belling machine, belling machine, pipe expanding machine
Product Description
KPM-SGK series Full-Auto Pipe Belling-machine Expander with drawing device and program interface concerned id used with extruding machine.It is also could separating operation. While expanding pipes,the machine adopts translation. The action is steady and correct.It does not damage pipe materials. The machine adopts double-infrared heating oven type. Each oven is equipped with heating core. The shaping method adopts expanding-end shaping. The size of pipe mouth is correct. On its panel, there is a transfer switch of expanding solvent type pipe socket sovent,rubber-ring expansion and rubber-ring lip type sockets. The choice of expanding pipe types is very convenient. The technological adaptability is strong. Its main electric control elements are all exportec. The system characteristics are steady and reliable.
Main Techincal data:
Model | Pipe Diameter | Heating Method | Belling Method | Heating power | Dimension |
SGK110 | 50-110mm | Electric heating | Mould physical expansion | 10.5kw | 7500x1400x1750mm |
SGK160 | 50-160mm | Electric heating | Mould physical expansion | 10.5kw | 7500x1400x1750mm |
SGK200 | 50-200mm | Electric heating | Mould physical expansion | 10.5kw | 7855x1350x1900mm |
SGK250 | 110-250mm | Electric heating | Mould physical expansion | 10.5kw | 7830x1620x1700mm |
SGK315 | 160-315mm | Electric heating | Mould physical expansion | 14kw | 8050x1750x1900mm |
SGK450 | 200-450mm | Electric heating | Mould physical expansion | 18kw | 8290x2090x2080mm |
SGK500 | 315-500mm | Electric heating | Mould physical expansion | 18kw | 8500x3050x2100mm |
SGK630 | 400-630mm | Electric heating | Mould physical expansion | 22.5kw | 8615x3125x2500 |
reference pics:
1,160mm automatic belling machine
3, 400mm belling machine
5, heating part with heating rods:
3. After-sales service
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD60 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of lading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK Machinery Co., Ltd.
WELCOME COME VIST OUR FACTORY LOCATED IN ZHANGJIAGANG.