Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CFR,CIF |
Payment Terms: | L/C, T/T |
Supply Ability: | 5000tons/month |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 06 |
---|---|
Means of Transport: | Ocean |
material: | Q235/Q345 |
color: | according to customers' requirment |
Production Capacity: | 5000tons/month |
Packing: | standard export packaging |
Delivery Date: | 30-60days after placed order |
Precast girder formwork has advantages of high-precision, simple
structure,retractile,easy-demoulding and simple operation. It can be hoisted or
dragged to casting site integrally, and demoulded integrally or piecemeal after
concrete achieving the strength, then pull out the inner mould from the girder.
It is handy installing and debugging, low labor intensity, and high
efficient.