user login

Box Girder Formwork Prestressed Box Girder Formwork Prestress Box Beam Formwork

1250.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CFR,CIF
Payment Terms: L/C, T/T
Supply Ability: 5000tons/month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 06
Means of Transport: Ocean
material: Q235/Q345
color: according to customers' requirment
Production Capacity: 5000tons/month
Packing: standard export packaging
Delivery Date: 30-60days after placed order
Show

Product Description

 Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

Post Buying Request