user login

Precast Segment assembly Formwork Bridge Formwork Formwork for Prestressed Concrete Box Girder Construction

1250.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CFR,CIF
Payment Terms: L/C, T/T
Supply Ability: 5000tons/month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 05
Means of Transport: Ocean
material: Q235/Q345
color: according to customers' requirment
Production Capacity: 5000tons/month
Packing: standard export packaging
Delivery Date: 30-60days after placed order
Show

Product Description

Professional precast formwork with ISO certificate
Box girder formwork segmental is necessary to build support and pour concrete at the construction site and traffic can be opened during the construction, which greatly reduces pressure on the traffic by the construction; module construction accelerates the onsite construction rates, which are more than a double for the traditional construction methods. This method increases science & technology content and technical level in urban viaduct project construction and massive use can reduce project cost.


Specifications
1 Materal: Q345
2 which reduces influences on surrounding residents and environment
3 Large lifting equipment is not requested
Box girder formwork segmental is necessary to build support and pour concrete at the construction site and traffic can be opened during the construction, which greatly reduces pressure on the traffic by the construction; module construction accelerates the onsite construction rates, which are more than a double for the traditional construction methods. This method increases science & technology content and technical level in urban viaduct project construction and massive use can reduce project cost.

Post Buying Request