Technique Content
Precast girder formwork has advantages of high-precision,
simple structure,retractile,easy-demoulding and simple operation. It can be
hoisted or dragged to casting site integrally, and demoulded integrally or
piecemeal after concrete achieving the strength, then pull out the inner mould
from the girder. It is handy installing and debugging, low labor intensity, and
high efficient.
Design technique of precasting girder mould
The mould
is integrated designed and stress analyzed in concordance with the girder
structure,girder span and arrangement of the casting site.The demoulding
mechanism is designed by simulating the trajectory of the inner mould.
The
girder's integrally or piecemeal pulling out of mould after precasting is
ensured by inner mould structure, connectors, inner mould support system,
hydraulic system, demoulding mechanism,guideway system and the segmental design
of inner mould.
The design of outer mould structure, way of locomotion,
support system of outer mould,pathway of temper mill, disposal of
oscillator,stair and rail.
Transport scheme should be considered when design
the inner and outer mould segmentation. The applicability of the mould to
different girder span .
The material selection: 12mm steel plate for bottom
mould and end mould;8mm steel plate for lateral mould and inner mould.