user login

Square Pile Cutting Equipment Hydraulic Breaker Hire 30mpa Max Crowd Pressure

Place of Origin: Zhejiang

Company Profile

Location: Nanjing, Jiangsu, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: KP500S

Product Description

TYSIM Hydraulic Piling Rig KP500S

 

Technical Specification of KP500S Hydraulic Pile Breaker
Type KP500S
Pile length 350~500mm
Max. rod pressure 280kN
Max. cylinder stroke 135mm
Max. crowd pressure 30MPa
Max. cylinder flow 20L/min
Quantity/8h 134/8h
Max. single cutting height ≤300mm
Excavator capacity ≥16t
Operating size 1588×1588×1500mm
Total weight 0.92t

 

 

 

Product Details

1. Cylinder-----Chinese Largest Cylinder Factory Brand: SANY Cylinder

2. Module-----Steel Casing, which is stronger than iron welding

3. Drill Rod-----3-times Special Heat Treatment, which guarantees its strength & tenacity

 

Performance

1. Simply operated with less staff, reducing the construction cost.

2. Crushing the piles wholly, reducing the consumption of energy.

3. Using adjustable chain, the pile breaker/cutter can be applied to constructions in different terrains.

4. Full hydraulic drive, low noise operation.

5. Quick assembled, more convenient to transport and more effciently.

6. Applying new material and new technology makes it much more reliable and reduces maintenance cost.

7. The design of simple changing modular and general technology can realize quick maintenance and extend the service life.

8. The design of long life can bring customers optimal benefits.

 

The operation steps of the pile

1. Make the pile breaker move to the place of the pile head.

2. Adjust the height of the pile breaker to the suitable cutting place (pleas refer to the construction parameter list, otherwise the chain may be broken), and clamp the pile posotion to be cut.

3. Adjust the excavator's systrm pressure according to the concrete strength, and pressurize the cylinder until the concrete pile is broken under high pressure.

4. After cutting the pile, hoist the concrete block.

5. Move the crushed pile to the designed position.

 

Why Choose Us?

1. Easy to operate. speed up to 134 piles in a 8 hour shift.

2. Little digging due to small dimensions.

3. Wear parts very durable and no special skills required for maintenance

4. Low machine weight, easy to connect to small excavator.

Post Buying Request