user login

Feiyide Plating Equipment Hard Chrome Plating Tank With Best Price

600.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CIF,EXW
Payment Terms: L/C, T/T, WU, Money Gram
Supply Ability: 30 Sets per momth
Place of Origin: Guangdong

Company Profile

Location: Dongguan, Guangdong, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Hardware & Electronics Electroplating Machine, Oxidizing Equipment, Electrophoresis Equipment, Electroplating Barrel

Product Detail

Model No.: FYD-T
Means of Transport: Ocean, Air, Land
Raw Material: Others
Power: Others
Machine Type: Others
Automation: Manual
Extra Services: Others
Material / Metal Processed: Alloy
Certification: ISO 9001:2000
Brand Name: Feiyide
Application: Plating
Availbale for: Hard Chrome Plating
Capacity: Customized
Workmanship: 100% Handmade
Raw Material: PP Plate
Warranty: One year
Shipping: By sea or air
Surrounding Equipment: Rectifier Filter Pump
Voltage: Customized
Power: Customized
Production Capacity: 30 Sets per momth
Packing: wooden boxes
Delivery Date: 15 days
Show

Product Description

Feiyide Plating Equipment Hard Chrome Plating Tank  With Best Price 

Product description

features 

1.customizing plating tank 

2.running speed adjustable

3.long time working 

4.high quality PP board

5.clean and neat main body

6.engineers for training and installation

product description  

surrouding equipment 

        rectifier                       filter                           heater 

       


example for plating process

more details

application electroplating 
available for hard chrome plating 
workmanship100% handmade 
raw material pp plate 
shipping by sea or air 
other service engineer and chemical liquid design 

this kind of palting equipment is suitable for metal parts hard chrome plating ,and the operation of it is manual operation .

we will customize the machine based on your basic information ,for exponent :capacity in an hour ,the raw material ,the size of your products .

what's more we will provide the CAD drawing ,plating process ,chemical liquid design ,and we will provide you for engineers available .


Company information 

      


    Dongguan Feiyide Machinery Equipment Factory is a professional manufacturing enterprise which collects together R&D, production and sale. we've been in this field for decades, Our company aims to further research and development of plating equipment and provide customers with the most excellent and suitable service. With the core of "Pursuing excellence, customer first", we constantly improve the metal plating technology aiming to be the best suppliers of electroplating industry and providing electroplating industry with the best plating technology.Based on high quality imported material and the most advanced electroplating production technology.       We have gradually formed a standardized production process, developed a series of electroplating equipments and other related auxiliary equipment. And now, we are specialized in making plating machines such as plating line, plating tank, plating barrel and water/gas treatment plant. Auxiliary equipment includes high frequencswitching power supply, filter,

 heater,temperature controller, titanium basket, oven,industrial water purification machine, chiller, etc.

Our Service 



We can provide you the following service:

1. Project design

2. Manufacturing

3. Installation and test

4. After-sale service


FAQ

1.Q: We need plating machine for ×××, could you send me a quotation? 
A: Because plating machine is always customized for different products, we'd like to send you quotation and make the design for you based on knowing detailed information from you first. 
2.Q: What is the necessary information you need for design?
A: The plating prosess you have had, The capacity of your per products, The material, weight, size, and surface area of your per product, The thickness of plating layer, Your working hours per day, Type of salt spray test and time, Workshop dimension and so on
3.Q: What's the lead time for one project?
A: It usually would take about 15-30days for production and the time is based on specific projects.
4.Q: How can I carry out my work if I plan to set up a new plating line?
A:It would be better if we could communicate with your chemical liquid supplier on the process details first. Besides, professional engineer is also important for your project.

 

Packaging and shipping 



Packaging details: container with wooden package

Delivery detail:20days


Post Buying Request