Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CIF,EXW |
Payment Terms: | L/C, D/P, T/T, Money Gram |
Supply Ability: | 1 Sets /Month |
Place of Origin: | Guangdong |
Location: | Dongguan, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Hardware & Electronics Electroplating Machine, Oxidizing Equipment, Electrophoresis Equipment, Electroplating Barrel |
Model No.: | FYD-AL |
---|---|
Power: | Others |
Raw Material: | Others |
Machine Type: | Others |
Extra Services: | Others |
Automation: | Automatic |
Certification: | ISO 9001:2000 |
Material / Metal Processed: | Others |
Brand Name: | Feiyide |
Application: | Chrome Gold Plating |
Plating Style: | Barrel Plating |
Available for: | Metal Jewel Plating |
Plating Position: | Dipping Position |
Power: | Actual Power |
Tank Material: | German PP board |
Raw Material: | PP PVC Copper |
Plating Speed: | Adjustable |
Controlling System: | PLC Controlling |
Voltage: | Customized |
Production Capacity: | 1 Sets /Month |
Packing: | Wooden boxes |
Delivery Date: | 30 Days after deposit |
Feiyide Automatic Barrel Plating Production Line for Gold Chrome Electroplating with German Raw Material
Product description
features
1.customizing plating line
2.running speed adjustable
3.long time working
4.high quality PP board
5.clean and neat main body
6.engineers for training and installation
main body
more details
1Application | Gold and Chrome Plating |
2Available for | A great number of metal parts plating |
3Automation | Automatic |
4Controlling System | PLC controlling |
5Tank Material | German PP board |
6Capacity | Over 10000 pieces |
7After-sale service | Engineers available for maintaining |
8Other service | Porcess design and chemical liquid supply |
surrounding equipment
rectifier DI water system filter
example of process
this production line is design for metals parts with gold and chrome plating ,it can work for a long time ,and more than 1000 pieces in 8 hours ,we use Geramn IGBT in rectifier and German PP brand for plating and rinsing tanks,Japanese Brand for PLC ,all of the actions is the pursue of the best service to our customer.make assurence the bonus of our customers
Company information
we Feiyide founded in 2008 ,specializing in electroplating equipment ,several customers have been choosing our company as their parthers.its our gigantic honor to supply our product .Including automatic equipment ,waste gas treatment tower,plating production line ,tumbing barrel ,water purification machine ,baking chamber and everything about electroplating equipment ,What'more ,we can supply engineers service overseas,to assure our customers could be gifted best service.
Our service
We can provide you the following service:
1. Project design
2. Manufacturing
3. Installation and test
4. After-sale service
Why choose us?
1. Advanced technology
We have a good cooperation with first class chemical liquid supplier, so we can provide environmental, economic design and suitable process design for production.
2. Optimized electroplating products' design
Optimized design system for plating tank, plating barrel and plating line, framework and control system. Over 15 years design and construction experience.
3. Using high-quality material and equipments
4. Provide process training
We offer training course of technical certification for customers and the directors are with over 10 years' experience.
5. Service assurance
7*24 hours multilingual services(Chinese, English, French, Russian, Arabic, Japannese).
Global Location
Large storage warehouse
DMS equipments: online failure analysis and maintenance system.
FAQ:
1.Q: We need plating machine for ×××, could you send me a quotation?
A: Because plating machine is always customized for different products, we'd like to send you quotation and make the design for you based on knowing detailed information from you first.
2.Q: What is the necessary information you need for design?
A: The plating prosess you have had, The capacity of your per products, The material, weight, size, and surface area of your per product, The thickness of plating layer, Your working hours per day, Type of salt spray test and time, Workshop dimension and so on
3.Q: What's the lead time for one project?
A: It usually would take about 15-30days for production and the time is based on specific projects.
4.Q: How can I carry out my work if I plan to set up a new plating line?
A:It would be better if we could communicate with your chemical liquid supplier on the process details first. Besides, professional engineer is anso important for your project.
Packaging and shipping
Packaging details: container with wooden package
Delivery detail:50days