Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CIF,EXW |
Payment Terms: | L/C, D/P, T/T, Money Gram |
Supply Ability: | 1 Sets /Month |
Place of Origin: | Guangdong |
Location: | Dongguan, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Hardware & Electronics Electroplating Machine, Oxidizing Equipment, Electrophoresis Equipment, Electroplating Barrel |
Model No.: | FYD-AL |
---|---|
Means of Transport: | Ocean, Air, Land |
Power: | Others |
Raw Material: | Others |
Machine Type: | Others |
Extra Services: | Others |
Automation: | Automatic |
Certification: | ISO 9001:2000 |
Material / Metal Processed: | Others |
Brand Name: | Feiyide |
Application: | Nickel Copper Silver Gold Plating |
Automation: | Automatic |
Available for: | Electronic and Hardware Part Plating |
Controlling System: | PLC Controlling |
Length of Line: | 40-80m |
Plating Position: | Dipping Plating |
Capacity: | Over 10000 Piece |
Surrounding Equipment: | Blower Filter Rectifier |
Plating Style: | Rack Plating Machine |
Weight: | Make to Order |
Production Capacity: | 1 Sets /Month |
Packing: | Wooden boxes |
Delivery Date: | 30 Days after deposit |
Feiyide Fishing Type Automatic Electroplating Line for Gold Silver Nickel Copper Plating with Customizing
Product description
Features
1 Stable and quiet working environment
2 Running speed adjustable
3 Engineer available
4 High production
5 Long-time working life
main structure
More details
1 Application | Nickel Copper Silver Gold Plating |
2 Available for | Electronic products and hardware parts |
3 Plating Position | Dipping position |
4 Working Time | Adjustable |
5 Controlling System | PLC Controlling |
6 Length of Iine | 40-80m |
7 Raw Material | PP PVC Copper |
8 Surrounding Equipment | Rectifier and filter pipe |
example of process
This line is designed for electronic parts and hardware parts manufacturing ,at the same time it could be used for gold silver nickel and copper plating .
We can control the palting line by PLC coltrolling system,convenient and labor-saving ,with high technology controlling ,it could provide you with standard and high-quality products.
It owns clean main body ,stable and quiet working environment because of its quality ,it possesses a long time working for decades. what's more ,it can save power supply and labor.
Company information
we are specialized in making plating machines such as plating line, plating tank, plating barrel and water/gas treatment plant. Auxiliary equipment includes high-frequency switching power supply, filter, heater, temperature controller, titanium basket, oven, industrial water purification machine, chiller, etc.
With the innovation of technology, the general customers' support and trust, there will be developing prospects. Our company sincerely hope to achieve a win-win situation with you and create a bright future hand in hand.
Our service
We can provide you the following service:
1. Project design
2. Manufacturing
3. Installation and test
4. After-sale service
FAQ:
1.Q: We need plating machine for ×××, could you send me a quotation?
A: Because plating machine is always customized for different products, we'd like to send you quotation and make the design for you based on knowing detailed information from you first.
2.Q: What is the necessary information you need for design?
A: The plating prosess you have had, The capacity of your per products, The material, weight, size, and surface area of your per product, The thickness of plating layer, Your working hours per day, Type of salt spray test and time, Workshop dimension and so on
3.Q: What's the lead time for one project?
A: It usually would take about 15-30days for production and the time is based on specific projects.
4.Q: How can I carry out my work if I plan to set up a new plating line?
A:It would be better if we could communicate with your chemical liquid supplier on the process details first. Besides, professional engineer is anso important for your project.
Packaging and shipping
Packaging details: container with wooden package
Delivery detail:50days