Place of Origin: | Zhejiang |
---|
Location: | Wuhan, Hubei, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Civil Engineering Bridge Construction, High Rise Building Construction, Bridge Construction Equipment |
Model No.: | JFP series |
---|
Jacking Formwork Platform Jacking Formwork System for UpperHills High Rise Core Construction
Project: Jacking Formwork Platform Applied in UpperHills High Rise Core Construction
Profile:
UpperHills apartment located at the north area of HOPSCA, it was composed of two building which heights are around 224.5m, it’s the 2nd tallest glass wall apartment building in Shenzhen, total covered area is 170,000, 62 storeys,total of 639 units. The main refined decoration unit is 106-358,a room to four room, few rough unit are 440-470, there are totally 1400 carports in the parking garage.
Solution:
UpperHills apartment core construction adopts KATTOR JFP system.The main parts applied in this project are the hydraulic jacking system.It was composed of main cylinders,telescopic cylinders,hydraulic pump stations and pipeline accessories. All cylinders working synchronously, to realize the lifting and lowering of the platform. Anti-falling and stress-strain monitoring system ensured the safety of all construction platform. Large capacity and long stroke cylinders realized construction efficiency of 3 days one storey,which greatly decreased the construction time of the project..