user login

GRP Chimney & Flue

Min. Order: 1 Piece/Pieces
Payment Terms: L/C, T/T
Supply Ability: 5000mt/year
Place of Origin: Hebei

Company Profile

Location: Hengshui, Hebei, China (Mainland)
Business Type: Manufacturer
Main Products: SOP, Caustic Soda Flakes, Cable Bridge, GRP Grating, GRP Winding Machine

Product Detail

Means of Transport: Ocean
Brand Name: FUSHENG
Production Capacity: 5000mt/year
Packing: container
Delivery Date: 7 days to 3 month
Show

Product Description

GRP Chimney & Flue

GRP (Glass Reinforced Plastic) or FRP (Fiber Reinforce Plastic) Chimney and Flue

HBFS can design, supply, assemble and install chimney or flue at plants. We are experienced in providing chimney or flue to all local and international markets, such as the power market for the FGD and CCS processes. Chimney or flue can be manufactured on site or in one of our workshops. We assemble ducts from the absorber to the chimney or cooling water tower. HBFS supplies ducts from different diameters, while our onsite winding machine can deliver ducts of 18 meters in diameter.

HBFS ducts are often used to transport gases from one process to the other. The chimney liners also transport gases to a higher level where it can be released to the environment without harming or having a major impact on the local environment.

HBFS designs and construct the ducts, chimney liners and stacks by using the Finite Element Method (FEM analysis) to meet the highest requirements and ensure a perfect quality and safety product.

HBFS has designed products for application at a temperature of 220˚C.

Advantages of using GRP (FRP) ducts:

1.High mechanical strength

2.Low weight

3.Exceptional chemical resistance

4.Excellent resistance to ageing and to atmospheric environments

5.Dimensional stability

6.Very high thermal insulation

7.Excellent resilience to temperature

8.Low thermal expansion coefficient

Ducts can be executed with:

1.90° Elbow with internal vanes

2.Segmented elbow

3.Transition pieces

4.Ladders and condensate drainage

5.Protection against electrostatic discharge

6.Manholes


Post Buying Request