user login

Q235 Q345 Steel Formwork for Constructions

20.0 USD
Min. Order: 15 Set/Sets
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: Paypal, L/C, D/P, D/A, T/T, WU, Money Gram
Supply Ability: 50000tons /month
Place of Origin: Beijing

Company Profile

Location: Beijing, China (Mainland)
Business Type: Trading Company
Main Products: Scaffolding, Steel Formwork, Thermal Insulation Material

Product Detail

Model No.: Horizon
Means of Transport: Ocean, Air, Land
Country: China
MOQ: 15 SETS
Material: Q235 Q345 steel
Color: OEM
Size: Standard or choice
Port: Xingang
Delivery time: Within 15 days after the deposit
Surface: Rusty painting
Certificate: ISO9001
Packing: In bulk or others
Production Capacity: 50000tons /month
Packing: In pallet, in bulk or others
Delivery Date: Within 15 days after the deposit
Show

Product Description

The steel formwork is built out of the prefabricated modules with a metal

frame (usually steel or aluminium) and covered on the application side with

material having the wanted surface structure. Conpared with the traditional

formwork, the steel formwork has two important advantages: the speed of

the construction and the lower life-cycle costs.

 

 

                    Quick Details

 

   Brand Name    Horizon
   Product Name    Concrete Steel Formwork
   Place of Origin    Beijing, China
   Material    Q235 steel
   Size    As per customer's request
   Color    Red or as per your request
   Feature    Reusable
   Certificate    ISO9001
   MOQ    3 Tons
   Payment Terms    L/C, TT and so on
   Delivery Time    Within 15 days after the deposit

 Characters

1. This kind of steel formwork can be made in many kinds of sizes and

    shapes for different concrete structure.

2. Steel formwork is easy to install and quick to strip from the concrete. 

3. Steel formwork can give you high stiffness.

4. Light weight thus can be handled by manual.

5. Reuse for more than 5 years.


Post Buying Request