Min. Order: | 15 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | Paypal, L/C, D/P, D/A, T/T, WU, Money Gram |
Supply Ability: | 50000tons /month |
Place of Origin: | Beijing |
Location: | Beijing, China (Mainland) |
---|---|
Business Type: | Trading Company |
Main Products: | Scaffolding, Steel Formwork, Thermal Insulation Material |
Model No.: | Horizon |
---|---|
Means of Transport: | Ocean, Air, Land |
Country: | China |
MOQ: | 15 SETS |
Material: | Q235 Q345 steel |
Color: | OEM |
Size: | Standard or choice |
Port: | Xingang |
Delivery time: | Within 15 days after the deposit |
Surface: | Rusty painting |
Certificate: | ISO9001 |
Packing: | In bulk or others |
Production Capacity: | 50000tons /month |
Packing: | In pallet, in bulk or others |
Delivery Date: | Within 15 days after the deposit |
The steel formwork is built out of the prefabricated modules with a metal frame (usually steel or aluminium) and covered on the application side with material having the wanted surface structure. Conpared with the traditional formwork,the steel formwork has two important advantages: the speed of the construction and the lower life-cycle costs.
Specifications
| |
Brand Name | Horizon |
Product Name | Concrete Steel Formwork |
Place of Origin | Beijing, China |
Material | Q235 steel |
Size | As per customer's request |
Color | Red or as per your request |
Feature | Reusable |
Certificate | ISO9001 |
MOQ | 3 Tons |
Payment Terms | L/C, TT and so on |
Delivery Time | Within 15 days after the deposit |
ADVANTAGES
1. This kind of steel formwork can be made in many kinds of sizes and
shapes for different concrete structure.
2. Steel formwork is easy to install and quick to strip from the concrete.
3. Steel formwork can give you high stiffness.
4. Light weight thus can be handled by manual.
5. Reuse for more than 5 years.
Why Choose Us
1. We will reply your inquiry within 24 hours
2. We accept OEM
3. Best after-sale service
4. On time delivery
5. Quality assurance